Opportunity
City of Los Banos #24-WC-0012
Flowmeter Replacement Project – Construction and Installation of Stormwater Flowmeters and Vaults
Posted
April 01, 2025
Respond By
May 22, 2025
Identifier
24-WC-0012
NAICS
237110, 237990
The City of Los Banos Public Works Department is procuring construction services for the Flowmeter Replacement Project at multiple storm station sites in Los Banos, California. - Government Buyer: - City of Los Banos Public Works Department - Products and Equipment: - Removal and replacement of stormwater propeller flow meters (sizes 6", 8", 12", 16") - 6-inch flowmeters: 5 units (2 removed/replaced, 3 installed) - 8-inch flowmeters: 4 units (1 removed/replaced, 3 installed) - 12-inch flowmeters: 7 units (3 removed/replaced, 4 installed) - 16-inch flowmeters: 10 units (5 removed/replaced, 5 installed) - Part numbers: LP06X12, LP08X12, LP12x12, LP16x12 - Concrete vaults for flowmeter registers: 10 units (4 demolished, 6 installed) - Handholes, excavation (67 units), and backfill (67 units) - Services: - General construction, demolition, installation, and commissioning of flowmeters and vaults - Locations: - Multiple storm station sites in Los Banos, CA, including Meadowlands, West I Street, College Greens, Badger Flats, and St. Francis Storm Stations - Unique Requirements: - Compliance with California prevailing wage laws - Contractor must be registered with the California Department of Industrial Relations and hold a valid Class A California State Contractor’s License - Strict requirements for bonds, insurance, safety, and environmental regulations - Project duration is 60 working days with liquidated damages for delays - OEMs: - No specific OEMs are named for the flowmeters; part numbers suggest compatibility with multiple manufacturers - Award: - Notice of Intent to Award issued to Taylor Backhoe Service, Inc. dba TBS Contractors
Description
The City of Los Banos is soliciting sealed bids for the Construction of the Flowmeter Replacement Project. The project involves removing and replacing stormwater propeller flow meters and their concrete vaults of sizes 6" to 16" at various sites within Los Banos, California. Additionally, the work may include installing new flowmeters and handholes at different pump station sites by cutting holes into existing discharge pipelines. The contract duration is 60 working days, and bidders must comply with California prevailing wage laws and be registered with the California Department of Industrial Relations.