Opportunity
City of Los Banos #25-CW-0001-2
Pavement Construction at F Street Corporation Yard Parking Lot, Los Banos, CA
Posted
September 16, 2025
Respond By
September 23, 2025
Identifier
25-CW-0001-2
NAICS
237310, 237990
This opportunity involves the construction of new pavement and a concrete valley gutter at the F Street Corporation Yard Parking Lot in Los Banos, CA. - Government Buyer: - City of Los Banos Public Works Department is the primary buyer, with references to the City of Fresno in related documents. - Vendors and OEMs: - No specific Original Equipment Manufacturers (OEMs) are named; all referenced vendors are general engineering and paving contractors. - Products and Services Requested: - Mobilization (1 unit) - SWPPP BMPs (Storm Water Pollution Prevention Plan Best Management Practices) (1 unit) - Pavement demolition (1 unit) - Finish grading (1 unit) - Dust control (1 unit) - 3" Asphalt pavement (398 tons) - 6" Class II aggregate base (796 tons) - 3' Concrete valley gutter (280 linear feet) - Manhole rim adjustment (1 unit) - Soils engineering and testing (1 unit) - Engineering, construction staking, and surveying (1 unit) - Unique or Notable Requirements: - Project is divided into two phases totaling approximately 21,200 square feet of new pavement - Compliance with California prevailing wage laws and contractor registration with the Department of Industrial Relations is required - Mandatory pre-bid meeting and strict schedule with liquidated damages for delays - Detailed technical specifications for materials, construction methods, and environmental controls (SWPPP BMPs) - Place of Performance: - F Street Corporation Yard, 1015 F Street, Los Banos, CA 93635 - Contracting office: City of Los Banos Public Works Department, 520 J Street, Los Banos, CA 93635
Description
The City of Los Banos is soliciting sealed bids for the construction of the pavement at the ‘F’ Street Corporation Yard Parking Lot located at 1015 F Street, Los Banos, CA. The project involves removal of existing pavement and construction of approximately 21,200 square feet of new pavement along with installation of a new valley gutter. The work is divided into two phases and must be completed within 60 calendar days. Bidders must attend a mandatory pre-bid meeting and hold an active California State Contractor’s License (Class A, C-8, or C-12).