Opportunity
Mobile Cityofmobile #6042
City of Mobile Solicits Bids for Exterior ADA Ramp at Cruise Terminal
Posted
April 13, 2026
Respond By
May 01, 2026
Identifier
6042
NAICS
238990, 541330
This opportunity involves the City of Mobile seeking bids for a semi-permanent, ADA-compliant exterior pedestrian ramp at the Mobile Alabama Cruise Terminal. - Government Buyer: - City of Mobile Engineering Department (Purchasing Department) - Products and Services Requested: - Design, procurement, and installation of a scaffolding-style, ADA-compliant pedestrian ramp - Connects 2nd floor to ground floor (approx. 18'10.5" height, 80' x 15' footprint) - Engineered for exterior placement and hurricane-force wind loads - Includes guard rails, handrails, non-slip surface, and ADA compliance - Intended for semi-permanent use (5-10 years) - Engineering and design services (including signed/sealed shop drawings and code compliance) - Installation services (procurement, delivery, permitting, erection, and inspection) - Optional bid items: - Overhead rain canopy - Rail-mounted footpath lighting system - Dismantling and reinstallation services for hurricane events - Unique/Notable Requirements: - Bidders must have an Alabama-licensed professional engineer on staff - Experience with public-use scaffold-style ramp structures required - Must meet insurance and licensing requirements - Ramp must be engineered for hurricane-force wind loads and exterior use - No specific OEMs or vendors are named; opportunity is open to qualified contractors - Place of Performance: - Mobile Alabama Cruise Terminal, 201 South Water St., Mobile, AL 36602
Description
The City of Mobile is soliciting sealed bids for the design, procurement, and installation of a pedestrian ramp at the Mobile Alabama Cruise Terminal. The ramp will connect the 2nd floor of the terminal to the ground floor, be ADA-compliant, engineered for exterior placement, and intended for semi-permanent use of 5-10 years. Bidders must be qualified engineers with experience in scaffold-style ramp structures and meet insurance and licensing requirements. The project includes optional elements such as an overhead canopy, lighting, and dismantling/reinstallation services for storm events.