Opportunity
City of Arlington Ionwave #PWDR22008
City of Arlington Ditch Improvements and Storm Sewer Replacement Project
Posted
April 13, 2026
Respond By
May 05, 2026
Identifier
PWDR22008
NAICS
237110, 237990, 237310
This opportunity involves a major public works construction project for the City of Arlington, Texas, focused on ditch improvements and storm sewer replacement across several city streets. - Government Buyer: - City of Arlington, Texas, Public Works Department - Office of the Director of Public Works - Project Scope: - Earthwork and replacement of storm sewer infrastructure - Demolition, paving, drainage, water, and sanitary sewer improvements - Work locations include Dan Gould Drive, Wood Lane, Bell Street, Waterview Drive, Chaperito Trail, and Jewell Drive - Installation and replacement of water lines (12" and 6" PVC), sanitary sewer lines (8" PVC), fire hydrant assembly, gate valves, manholes, reinforced concrete pipe (RCP) driveway culverts (18", 15", 24"), concrete sidewalks, asphalt pavement, concrete curb and gutter, traffic control signs, and erosion control devices - Products/Materials Requested: - 400 linear feet of 12" PVC (C-900) DR-18 water pipe - 29 linear feet of 6" PVC (C-900) DR-18 water pipe - 498 linear feet of 8" PVC sanitary sewer pipe - 17 linear feet of 4" sewer service with cleanout - 1 fire hydrant assembly, 1 12" gate valve, 1 6" gate valve, 1 5' sanitary sewer manhole - Replacement of various sizes of RCP driveway culverts - Concrete sidewalk, asphalt pavement repair (50 linear feet), concrete curb and gutter repair (16 linear feet), traffic control signs, erosion control devices - Unique/Notable Requirements: - Prime contractor must be prequalified with the Public Works Department in storm sewer prior to bid opening - All bidders and subcontractors must be prequalified in the appropriate work category - Compliance with prevailing wage rates - Performance and payment bonds, plus a two-year maintenance bond after acceptance - Strict adherence to stormwater pollution prevention and environmental protection measures - Coordination with utility companies required - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Estimated Contract Value: - Engineer's estimate is approximately $6,009,000
Description
The City of Arlington, Texas, is soliciting bids for a project primarily involving earthwork and storm sewer replacement across multiple streets including Dan Gould Drive, Wood Lane, Bell Street, Waterview Drive, Chaperito Trail, and Jewell Drive. The project requires the prime contractor to be prequalified with the Public Works Department in storm sewer prior to bid opening. Bids are to be submitted offline by May 5, 2026, and a pre-bid teleconference is scheduled for April 21, 2026. The engineer's estimate for the project is approximately $6,009,000.