Opportunity
Kentucky CGI Advantage 4 #RFB-785-2200000272-2
Roof Replacement at Central State Hospital, LaGrange, KY
Posted
November 14, 2021
Respond By
December 07, 2021
Identifier
RFB-785-2200000272-2
NAICS
238160
This opportunity involves a state-level procurement for roof replacement at Central State Hospital in LaGrange, Kentucky. - Government Buyer: - Commonwealth of Kentucky, Cabinet for Health and Family Services (CHFS) - Division of Engineering and Contract Administration - Key contacts: Kristi Sharp (Procurement Analyst), Carl Kratzer (Engineering) - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation documents. - Products/Services Requested: - Removal and replacement of approximately 26,648 square feet of roofing across the Ackerly, Connelly, and Boiler room buildings - Existing roofs: asphalt on concrete and wood decks, asphalt/EPDM on metal decks, and a small area of shingle roof - New system: SBS Modified Asphalt Two Ply roofing, cold adhered over rigid board insulation - Includes testing and reusing existing roof drains - Replacement of all pre-finished metal roof coping caps, flashings, accessories, and terminations - Unique or Notable Requirements: - All project documentation and communications must be handled through the Owner's web-based document collaboration system (eCommunications) - Pre-bid meeting required at the hospital's Maintenance Building loading dock - Bidders must download documents from the State Plan Room and submit bids electronically - Place of Performance: - Central State Hospital, 10510 LaGrange Road, LaGrange, KY
Description
This solicitation is for re-roof work at the Central State Hospital in La Grange, Kentucky, specifically for the Ackerly, Connelly, and Boiler room buildings. The project involves removing approximately 26,648 square feet of existing roofs, which include asphalt roofs on concrete and wood decks, asphalt/EPDM on metal deck, and a small portion of shingle roof. The new roofing system will be a SBS Modified Asphalt Two Ply system cold adhered over rigid board insulation. Existing roof drains will be tested and reused, and all pre-finished metal roof coping caps, flashings, accessories, and terminations will be replaced.