Opportunity
SAM #AA-2026-05
Procurement of LMR195 Flexible Coaxial Jumper Cables for ALS-U at Lawrence Berkeley National Laboratory
Buyer
LBNL
Posted
April 10, 2026
Respond By
April 23, 2026
Identifier
AA-2026-05
NAICS
335929, 334419
Lawrence Berkeley National Laboratory (LBNL), managed by the University of California for the Department of Energy, is soliciting quotations for high-frequency flexible LMR195 coaxial jumper cable assemblies for the Advanced Light Source Upgrade (ALS-U) project. - Government Buyer: - Department of Energy (DOE), Lawrence Berkeley National Laboratory (LBNL), Procurement Department - OEMs and Vendors: - No specific OEMs or vendors are named; LMR195 is a well-known cable type manufactured by companies such as Times Microwave Systems - Products/Services Requested: - LMR195 flexible coaxial jumper cable assemblies with straight SMA(M) connectors - 2.0 ft length (LMR195-2.0FT): 60 units (first article) - 2.5 ft length (LMR195-2.5FT): 16 units (first article) - 3.5 ft length (LMR195-3.5FT): 8 units (first article) - Production batch (LMR195-(length)FT): 984 units (lengths to be determined after first article approval) - All cables must be supplied in four color-coded groups (Blue, Red, Green, White) - Unique or Notable Requirements: - Cables must meet precise impedance and phase matching requirements (±10 ps) - Support frequencies from 0.05 to 18 GHz - 100% testing and detailed documentation required - Sustainability compliance and shipping insurance are mandatory - First article testing and approval required before production batch - Electrical device certification required - Delivery/Performance Locations: - All deliveries to Lawrence Berkeley National Laboratory, One Cyclotron Road, Berkeley, CA 94720
Description
Dear Prospective Offeror:
The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Quote (RFQ) No. AA-2026-05 for Flexible Cables that will be utilized in the ALS-U.
The RFQ and associated documents (listed below) are attached:
0. RFQ and submission instructions
1. Statement of Work
2. Acceptance Criteria List
3. Sample Subcontract
4. Rep Cert Form (required with submission if total Quote is in excess of $150K)
5. Past Performance Reference Information Form (submit with Quote regardless of value)
*With your Quote submission, you must certify in writing that you meet and agree to all of the Mandatory Requirements outlined within Doc 0. RFQ AA-2026-05 and will manufacture per SOW.
Timeline of Events:
RFQ Release - April 10, 2026
Quotes Due - April 23, 2026
We look forward to your participation.