Opportunity
Bullhead City #26-U-006
Bullhead City South Supply Line Phase 3 Water Main Installation Solicitation
Posted
April 08, 2026
Respond By
April 29, 2026
Identifier
26-U-006
NAICS
237110
This opportunity involves the City of Bullhead City Utilities Department seeking bids for the South Supply Line Phase 3 water main installation project. - Buyer: City of Bullhead City Utilities Department - Scope of Work: - Installation of approximately 4,700 feet of 16-inch C900 DR-14 PVC water transmission main - Additive alternative: installation of approximately 1,450 feet of 10-inch C900 DR-14 PVC distribution main (to be placed in the same trench as the transmission main) - Additional components: butterfly valves, gate valves, air vacuum release valves, blowoff valves, steel casing, and related fittings - Ancillary work: mobilization/demobilization, bonds, insurance, traffic control, survey monuments, stormwater BMPs, utility potholes, construction staking, striping, pavement markings, signage, aggregate base course, bituminous prime coat, asphalt milling, asphalt concrete pavement, tack coat, and owner contingency - No specific OEMs or named vendors are identified in the solicitation - Notable Requirements: - All pipe must be C900 DR-14 PVC - The 10-inch distribution main (additive alternative) must be installed in the same trench as the 16-inch transmission main - Completion required within 90 calendar days after Notice to Proceed; liquidated damages apply for delays - Place of Performance: City of Bullhead City, Arizona (primary); bid submission at Bullhead City Clerkâs Office - No recurring services or annual subscriptions; this is a one-time construction project
Description
This solicitation is for the South Supply Line Phase 3 project in Bullhead City, Arizona. The project involves installing approximately 4700 feet of 16-inch transmission main and includes an additive alternative to install about 1450 feet of 10-inch distribution main in the same trench. Sealed bids are to be submitted to the Bullhead City Clerk's Office by April 29, 2026, with no pre-bid conference scheduled. The work is managed by the Bullhead City Utilities Department.