Opportunity

SAM #140P4326Q0021

Replacement and Installation of Septage Receiving Station at Assateague Island National Seashore

Buyer

NPS Natural Resources Stewardship and Science Directorate

Posted

April 09, 2026

Respond By

April 30, 2026

Identifier

140P4326Q0021

NAICS

562991, 237110, 238210

This opportunity involves the replacement of the septage receiving station at Assateague Island National Seashore, managed by the National Park Service (NPS), Northeast Region. - Government Buyer: - National Park Service, Northeast Region, Assateague Island National Seashore Facility Management Division - Contracting managed by NER Services MABO at Charlestown Navy Yard, Boston, MA - OEMs and Vendors: - No specific OEMs or vendors are named; the requirement is for a pre-engineered, pre-assembled, stainless steel cylindrical bar screen septage receiving station fabricated in the USA - Products/Services Requested: - Pre-assembled, pre-wired, and pre-plumbed cylindrical bar screen septage receiving station - Features: 3-plane cylindrical bar screen, screen basket, rotating rake, cleaning comb, screw conveyor, dewatering screw, screening press - Material: AISI Type 304 Stainless Steel - Capacity: 300 gallons per minute - Power: 208/460V, 3 Phase - Control: NEMA 4X 304 stainless steel main LED control panel - Additional: 3W x 6L x 3H receiving tank, 1/4 inch bar spacing, 4 inch quick coupling inlet, 2HP VFD, three wash system, fail-safe features, mercury-free float switches - Installation of approximately 85 feet of schedule 80 PVC piping and fittings at the wastewater plant - Includes stainless steel hangers, shutoff ball valves, reducing fittings, and frost-free spigot - Services: - Removal of existing station, site preparation (grading, plumbing, electrical), installation, startup, and staff training - One-year maintenance contract to ensure staff proficiency and equipment reliability - Unique or Notable Requirements: - The septage receiving station must be fabricated in the USA and meet detailed technical specifications - Contractor must provide installation, startup, and training services - One-year maintenance contract is required - Technical capability and past project experience are evaluation factors - Lump sum pricing for both main work and optional pipe installation - Locations: - Place of performance: Assateague Island National Seashore, 7206 National Seashore Lane, Berlin, MD 21811 - Contracting office: Charlestown Navy Yard, Boston, MA

Description

Assateague Island National Seashore - REPLACE SEPTAGE RECEIVING STATION

View original listing