Opportunity
City of Columbia Ionwave #62/2026
Phased Reconstruction of Terminal Loop Road at Columbia Regional Airport (COU)
Posted
April 08, 2026
Respond By
April 28, 2026
Identifier
62/2026
NAICS
237310, 237990
This opportunity involves the reconstruction of Terminal Loop Road at Columbia Regional Airport (COU) in Columbia, Missouri. - Government Buyer: - City of Columbia, Missouri (Purchasing Division), for Columbia Regional Airport - Project managed by Burns & McDonnell Engineering Company, Inc. - Scope of Work: - Demolition and removal of existing pavement and sidewalks - Construction of new concrete roadway with curb, 4" and 6" concrete sidewalks and ramps - Installation of 7" Portland cement concrete pavement and 4" Type 3 aggregate base - Application of pavement markings (striping) and installation of new signage - Earth excavation, seeding, mulching, erosion control, and construction staking - Maintenance of traffic during construction - Bid alternate for parking lot entrance tie-ins (demolition and reconstruction) - Products/Services Requested (with part numbers and quantities where available): - Installation and Removal of Erosion Control (C-102.1, qty: 1) - Earth Excavation (201.1, qty: 266) - Seeding and Mulching (203.1, qty: 475) - Removal of Asphalt Pavement and Base (208.1, qty: 1885) - Removal of Sidewalk and Base (208.3, qty: 118) - 4" Type 3 Aggregate Base (212.4, qty: 2131) - Mobilization (215.1, qty: 1) - Construction Staking (216.1, qty: 1) - 7" Portland Cement Concrete Pavement (231.1, qty: 2026) - 4" Concrete Sidewalk (234.1, qty: 343) - 6" Concrete Sidewalk Ramp (234.1, qty: 61) - Maintenance of Traffic (241.1, qty: 1) - Signage (241.2, qty: 1) - Striping (242.1, qty: 1) - Unique/Notable Requirements: - Compliance with FAA Buy American Preference - Adherence to prevailing wage laws and FAA construction standards - Coordination with airport operations; phased construction (three sequential phases, 35 days each) - Liquidated damages of $2,500 per day for late completion - Insurance, bonding, and construction safety program required - No specific OEMs for materials or equipment are named; standard construction materials and methods are specified. - All work is subject to FAA and owner inspection and approval.
Description
The City of Columbia, Missouri is soliciting bids for the reconstruction of a portion of Terminal Loop Road at the Columbia Regional Airport (COU). The project includes demolition of existing pavement, construction of a concrete roadway with curb, sidewalk construction, pavement marking, and new signage installation. The work is to be completed in three phases, each within 35 calendar days, totaling 105 days from the notice to proceed. Bidders must submit sealed bids by April 28, 2026, either in person or electronically.