Opportunity

SAM #SPMYM126Q4055

Procurement of Kent Lathe and Surface Grinder with Accessories for Norfolk Naval Shipyard

Buyer

DLA Maritime - Norfolk

Posted

April 09, 2026

Respond By

April 14, 2026

Identifier

SPMYM126Q4055

NAICS

339999, 333517, 423830

This opportunity involves the Defense Logistics Agency (DLA) Maritime Norfolk Contracting Division seeking new industrial equipment for the Norfolk Naval Shipyard. - Government Buyer: - Defense Logistics Agency (DLA), DLA Maritime Norfolk Contracting Division, supporting Norfolk Naval Shipyard - OEMs and Vendors: - Kent (primary OEM for lathe and surface grinder) - Aloris (tool post and holders) - Royal (spindle live center) - Products/Services Requested: - 1 Kent HW 2680 Lathe (part number 2680 or 60769530) - Includes: DRO System 80 (2-axis), Aloris DA #5-Set Tool Post and 6 Holders (part number 60769532), Royal spindle type live center (M.T. #5, part number 60769533), front mount 4-jaw independent chuck (16" D1-11, part number 60769534), micrometer carriage stop (part number 60769535) - 1 Kent SGS 1230 AHD Surface Grinder (part number 60769537) - Includes: DRO System 80 (2-axis) - Unique or Notable Requirements: - All equipment must be new and include installation - Solicitation is a 100% small business set-aside - Evaluation will be based on Lowest Price Technically Acceptable (LPTA) - Delivery required to Norfolk Naval Shipyard - Place of Performance/Delivery: - Norfolk Naval Shipyard, Norfolk, VA - Contracting office located in Portsmouth, VA

Description

The Contract Line Items (CLINs) are as follows:

60769530 – KENT HW 2680 LATHE

QTY: 1 each

•(60769531) DRO System 80"(2-axis, x=0.0001" /z=0.0005" res) DRO installation

•(60769532) Aloris DA #5-SET (Tool Post and 6 holders)

•(60769533) Royal spindle type live center (M.T. #5)

•(60769534) Front mount 4-jaw independent Chuck (16" D1-11)

•(60769535) Micrometer carriage stop

60769537 - KENT SGS 1230 AHD SURFACE GRINDER

QTY: 1 each

•(60769537) DRO SYSTEM 80"(2-AXIS, X=0.0001"/Z=0.0005" RES  DRO installation

REFER TO THE COMBINED SYNOPSIS FOR MORE INFORMATION

MUST ADHERE TO EVALUATION FACTORS AND REQUIRED DOCUMENTATION LISTED IN THE COMBINED SYNOPSIS

View original listing