Opportunity
North Carolina eVP #287-27777-CB-RB
UNC Charlotte Sanitary Sewer and Stormwater Infrastructure Rehabilitation and Replacement (South Village)
Posted
April 09, 2026
Respond By
April 16, 2026
Identifier
287-27777-CB-RB
NAICS
237110, 237990
This opportunity involves major sanitary sewer and stormwater infrastructure rehabilitation and replacement at the University of North Carolina at Charlotte's South Village area: - Government Buyer: - University of North Carolina at Charlotte (UNC Charlotte), through the UNC System Office Design/Construction - Products and Services Requested: - Cured-in-place pipe (CIPP) lining for 6"–10" sewers (1,668 linear feet total), with both thermal and UV-cure options - Cementitious manhole lining (171 vertical feet) and manhole rehabilitation (including raising, sealing, and frame/chimney work) - Installation of new gravity sanitary sewer pipes (8" and 12" PVC/DIP, 425+ linear feet) and aerial stream crossing - New precast concrete manholes (4 units, various depths and types) - Stormwater improvements: new reinforced concrete pipe (RCP), riprap, geotextile, drainage structures, and related items - Surface and site restoration: asphalt, concrete, brick pavers, retaining walls, handrails, and landscaping - Sediment and erosion control: silt fencing, tree protection, seeding, and matting - Cleaning and CCTV inspection of existing sewers (over 1,600 linear feet) - Point repairs, main connections, drop connections, and abandonment of old manholes/sewers - Bid alternates: porous grass pavers for access, Scott Hall Lane regrading/repaving, additional stormwater and surface restoration - Unique/Notable Requirements: - CIPP systems must comply with ASTM standards and allow for UV-cure technology - All work must be coordinated with the university for utility outages and pedestrian traffic - Construction on an active college campus with strict traffic and safety controls - Requires NC General Contractor License (Public Utility classification), 5% bid bond, and 100% performance/payment bonds - HUB participation and compliance with university construction standards - No specific OEMs are named, but CIPP and manhole lining systems must meet industry standards; UV-cure CIPP technology is specifically permitted - Major quantities include thousands of linear feet of pipe work, multiple manholes, and extensive restoration and stormwater improvements
Description
This solicitation is for the rehabilitation and replacement of sanitary and storm sewer infrastructure at the South Village area of the University of North Carolina at Charlotte campus. The project includes installation of new gravity sanitary sewer, replacement of manholes and drainage structures, cleaning and CCTV inspection of existing sewers, cured-in-place pipe lining, manhole rehabilitation, and associated surface and site restoration. Work also involves bid alternates for access drive replacement and storm drainage improvements. The project requires coordination with the university for utility outages and pedestrian traffic control, with construction expected to last 274 calendar days.