Opportunity

Washington Bothell Civic Plus #PW-0150

City of Bothell Solicits Construction for 224th St SW Non-Motorized Improvements

Posted

April 09, 2026

Respond By

April 23, 2026

Identifier

PW-0150

NAICS

237310, 237990

This opportunity involves the City of Bothell's solicitation for construction services to improve non-motorized infrastructure along 224th St SW, focusing on pedestrian safety and accessibility. - Government Buyer: - City of Bothell, Public Works Department, Engineering Division - Scope of Work: - Construction of an 8-foot separated sidewalk on the north side of 224th St SW (Frank Love Elementary School to Meridian Ave S) - Curb ramp reconstruction at 1st Pl W and Meridian Ave intersections - Installation of a rapid rectangular flashing beacon system - Stormwater system improvements, including ductile iron and PVC storm sewer pipes, catch basins, and drainage connections - Utility relocations, hot mix asphalt paving with fiber reinforcement, and driveway entrance construction - Erosion control, landscaping, and restoration of disturbed areas - Relocation of the school speed zone camera system and signage - Products and Materials: - Cement concrete sidewalk, curb, gutter, and ramps - Hot mix asphalt (HMA), crushed surfacing base and top course - Ductile iron and PVC storm sewer pipes (12" and 18" diameters) - Catch basins, inlet protection, silt fence - Flashing beacon assemblies and associated electrical/conduit work - Quantities (selected): - 610 sq yd cement concrete sidewalk - 990 linear ft cement concrete traffic curb and gutter - 250 tons hot mix asphalt - 650 linear ft 12" PVC storm sewer pipe - 103 linear ft 18" ductile iron storm sewer pipe - 1 flashing beacon system - Unique/Notable Requirements: - Compliance with City of Bothell and WSDOT standards - ADA-compliant features and documentation - Washington State prevailing wage rates - Erosion control and water pollution prevention plan - Disadvantaged business enterprises encouraged to participate - Bid bond of at least 5% required - Estimated Contract Value: - $1,000,000 to $1,500,000 - Period of Performance: - Physical completion required within 75 working days from Notice to Proceed - Locations: - 224th St SW (from 1st Pl W to Meridian Ave S), City of Bothell, WA - Frank Love Elementary School vicinity - City of Bothell Public Works/Engineering Division

Description

The City of Bothell is soliciting sealed bids for the 224th St SW Non-Motorized Improvements project, which involves constructing a separated sidewalk on the north side of 224th St SW from the entrance of Frank Love Elementary School to Meridian Ave S. The work includes curb ramp reconstruction at intersections, installation of a rapid rectangular flashing beacon, and stormwater system improvements and connections. The project has an estimated cost between $1 million and $1.5 million, with a physical completion timeframe of 75 working days. Bids are due by April 23, 2026, and must be submitted to Bothell City Hall.

View original listing