Opportunity
Muscatine Ionwave #2026-0108
Muscatine, IA West Hill Area Sanitary and Storm Sewer Separation Phase 6E Construction Solicitation
Posted
April 08, 2026
Respond By
April 24, 2026
Identifier
2026-0108
NAICS
237110, 237310, 237990
This opportunity involves a major municipal infrastructure project in Muscatine, Iowa for the separation of sanitary and storm sewers (West Hill Area, Phase 6E): - Government Buyer: - City of Muscatine, Iowa (Public Works Department) - Products and Materials Requested: - Over 6,000 linear feet of new 8-inch and 12-inch sanitary sewer pipe (PVC, SDR 26 and truss type) - Over 5,500 linear feet of new 12-inch to 30-inch storm sewer (reinforced concrete pipe, PVC, and HDPE) - 813 feet of 8-inch cured-in-place pipe (CIPP) lining - 31 feet of 48-inch polyurethane pipe lining - 500 feet of water main relocation (C-900 PVC, restrained joint) - Large quantities of subdrain, manholes, inlets, fittings, and related infrastructure (e.g., granular subbase, geotextile, backfill, topsoil) - Additional materials: copper water service pipe, ductile iron pipe for conflicts, asphalt and concrete pavement, landscaping materials, erosion control products - Services Requested: - Installation of all above piping and structures - Manhole and inlet installation, sanitary service connections, and internal home replumbing - Full-width pavement removal and replacement, sidewalk and driveway construction, sodding, seeding, and landscaping - Trench spoil removal, erosion control, temporary traffic control, and construction survey - Video inspection and cleaning of sewers, record drawings, and maintenance of postal/solid waste services during construction - Unique or Notable Requirements: - Compliance with federal requirements: Davis-Bacon prevailing wage, American Iron and Steel provisions, DBE participation - Prohibition on certain telecommunications equipment - All bids must be submitted via the City's IonWave portal - Granular pipe backfill required under streets; trench spoil material must be removed to a contractor-selected location - OEMs and Vendors: - No specific OEMs or part numbers are mandated; materials must meet ASTM and AWWA standards as specified - Locations: - Work performed in Muscatine, Iowa, with key addresses including City Hall (215 Sycamore Street) and Public Works (1459 Washington St.) - Stanley Consultants (225 Iowa Avenue) listed as a contact address - Period of Performance: - Project completion timeline and milestones are defined in the contract documents; no explicit duration or option years stated
Description
This solicitation is for the construction of Phase 6E of the West Hill Area Sanitary and Storm Sewer Separation project in Muscatine, Iowa. The work includes installation of approximately 6,290 feet of new 8" and 12" sanitary sewer lines, cured-in-place lining of existing sewers, and about 5,560 feet of new 12" to 30" storm sewer with associated inlets and piping. Additionally, approximately 500 feet of water main relocation is included. The project also involves manholes, service connections, pavement removal and replacement, sidewalk construction, sodding, and related work. Bids must be submitted via the City's IonWave bidding site by April 24, 2026, with a pre-bid conference scheduled for April 16, 2026.