This opportunity involves the U.S. Space Force's 21st Civil Engineer Squadron at Peterson Space Force Base seeking a contractor for the refurbishment of an air handling unit (AHU) at Building 1171. - Government Buyer: - U.S. Space Force, 21st Civil Engineer Squadron (21 CES CEX) - Contracting office: Peterson SFB, Colorado Springs, CO - OEMs and Vendors: - Existing AHU is manufactured by Trane (serial number U3A26715) - No specific OEMs or part numbers required for replacement components, but work must meet original manufacturer specifications - Products/Services Requested: - Refurbishment of the Trane air handling unit at Building 1171 - Remove and replace all fan bearings and fan shaft - Install new supports to mitigate vibration - Conduct static air pressure and airflow tests to verify system meets original design - Startup system with Variable Frequency Drive - Ensure coil loop is free of air bubbles - Provide a detailed Gantt chart schedule for government approval - Unique/Notable Requirements: - All work must ensure the AHU meets or exceeds original Trane airflow specifications - Contractor must provide a detailed work schedule and conduct system verification tests - 100% small business set-aside under NAICS 238220 - Place of Performance: - Building 1171, Peterson SFB, Colorado Springs, CO 80914 - Contracting office at Peterson SFB, 135 Dover Street Ste 1055, Colorado Springs, CO 80914-1117 - Additional reference: 580 Goodfellow St Bldg 1324, Peterson AFB, CO 80914-2370

Description

Project is to refurbish air handling unit (AHU) at Building 1171. To accomplish this several AHU components will need to be repaired/replaced. Work schedule shall be clearly delineated in a Gantt chart schedule with the dates submitted to the Government for review and approval. Existing Unit: Trane, s/n U3A26715. Contractor shall remove and replace all fan bearings as well as fan shaft. There should be no vibration, and a static air pressure test shall be conducted to ensure manufacturer's specification cubic feet per minute are being produced at supply air trunk. Contractor shall startup system to ensure existing AHU with Variable Frequency Drive. Contractor shall test the airflow to verify flows match original design. Contractor shall make sure that the loop remains free of air bubbles when filling the coil with water. Contractor shall test and balance the airflow to match original design airflow to conditioned areas. Replace fan shaft with original manufacturer size shaft and install new supports to mitigate vibration of the shaft.

View original listing