Opportunity

City of Sacramento PlanetBids #PN: W14150704

Construction of St Lukes Detention Basin Project – City of Sacramento

Posted

April 03, 2026

Respond By

April 29, 2026

Identifier

PN: W14150704

NAICS

237110, 237990

This opportunity involves the construction of the St Lukes Detention Basin Project for the City of Sacramento Department of Utilities: - Government Buyer: - City of Sacramento, Department of Utilities, Engineering & Water Resource Division, Engineering Services Division - OEMs and Vendors: - Advanced Drainage Systems (ADS) is specified for the storm drain pipe (ADS Triple Wall Sanitite HP Pipe) - No other specific OEMs are named for major materials - Products and Materials Requested: - Custom precast 7-foot by 10-foot vault (1 unit) - ADS Triple Wall Sanitite HP Pipe, 36-inch diameter (approx. 400 linear feet) - Standard manhole (1 unit) - Security fencing and gates (quantity not specified) - Mobilization and demobilization services - Traffic control equipment and services - Site clearing, grubbing, and basin excavation (10,500 units) - Tree removal (10 units) - Utility potholing (7 units) - Haul-off and disposal of excess excavated material (14,200 units) - Hydroseeding for soil stabilization (50,000 units) - Pipe inlet/outlet structure (1 unit) - Vault structure and storm drain re-connection (1 unit) - Wrought iron double swing gate (1 unit) - Chain link fence (875 linear feet) - Double leaf chain link swing gates (1 unit) - Detention basin access ramp and low flow channel (1,740 units) - Asphalt entrance driveway (360 units) - Concrete sidewalk driveway (230 units) - Services Requested: - Clearing and grubbing - Excavation and construction of detention basin - Construction of inlet/outlet structures, drive ramp, low-flow channel, access roads, and site restoration - Unique or Notable Requirements: - California Contractor's License Type A required - Compliance with City of Sacramento Local Business Enterprise (LBE) participation goals - Prevailing wage requirements - Mandatory pre-bid meeting attendance - Environmental and labor code compliance - Liquidated damages for late completion - Place of Performance and Delivery: - Main project site: 7595 Center Parkway, Sacramento, CA 95823 - Additional references: 1395 35th Avenue (Utilities office), New City Hall at 915 I Street (contracting office) - Estimated contract duration: 105 working days

Description

This solicitation is for the construction of the St Lukes Detention Basin Project in Sacramento, CA. The work includes installing a custom precast vault, connecting to existing storm drain pipelines, installing new storm drain pipes and manholes, clearing and grubbing, excavation, constructing a detention basin, inlet/outlet structures, drive ramp, low-flow channel, security fencing and gates, access roads, and site restoration. The project requires a license type A and bids must be submitted in paper format. A pre-bid meeting is scheduled for April 15, 2026, and bids are due by April 29, 2026.

View original listing