Opportunity
Saskatchewan Tenders #TFL2026-01
Veranda Revitalization Project at Douglas Heritage House, Town of Foam Lake
Posted
March 30, 2026
Respond By
May 01, 2026
Identifier
TFL2026-01
NAICS
238190
The Town of Foam Lake is seeking qualified contractors for the Veranda Revitalization Project at the Douglas Heritage House in Foam Lake, Saskatchewan. - Government Buyer: - Town of Foam Lake, Leisure Services Department - OEMs and Vendors: - No specific OEMs or vendors are named; contractors may propose equivalent materials - Products/Services Requested: - Removal of existing exterior wall elements - Installation of 6x6 pressure-treated structural posts with white decorative caps - Floor resurfacing with 1/2 inch G1S plywood or equivalent exterior-grade material - Installation of waterproof, slip-resistant, UV resistant exterior-grade white vinyl flooring - Installation of new 2x8 base boards finished with vinyl cladding or wrap - Supply and installation of a white wood railing system (PVC or aluminum alternatives may be considered if wood is unavailable) - Site cleanup - Unique or Notable Requirements: - Contractors must provide all materials, labor, equipment, and supervision - All work must comply with applicable safety and building codes - Painting is excluded from the scope - Project must be completed between June 1 and September 1, 2026, avoiding scheduled public events at the venue - Proof of liability insurance and Saskatchewan Workers Compensation Certificate required - Adherence to municipal, provincial, and national codes is mandatory
Description
The Town of Foam Lake is seeking qualified contractors to tender for the revitalization of a veranda at the Douglas Heritage House located at 320 Highway 16, Foam Lake, SK. The scope includes removal of existing exterior wall elements, installation of structural posts, resurfacing the floor, installing weatherproof vinyl flooring, new base finishing, wood railing installation, and site cleanup. Contractors must provide all materials, labor, equipment, and supervision, and comply with all relevant codes and permits. The project timeline is from June 1, 2026, to no later than September 1, 2026.