Ozarks Technical Community College Ionwave #NKM Boiler Replacement Addendum 2 (NKM Boiler Replacement)

NKM Boiler Replacement Project at Ozarks Technical Community College Springfield Campus

Posted

March 24, 2026

Respond By

April 07, 2026

Identifier

NKM Boiler Replacement Addendum 2 (NKM Boiler Replacement)

NAICS

238220, 238210, 238290

Ozarks Technical Community College in Springfield, Missouri is seeking bids for the NKM Boiler Replacement project at its Springfield Campus. - Government Buyer: - Ozarks Technical Community College (Community College District of Central Southwest Missouri) - Office of Facilities and Grounds - Project Scope: - Replacement of two boilers, two pumps, piping, and hydronic specialties in the NKM building boiler room - Installation of condensing boilers (natural gas fired, fire tube design, 316L stainless steel heat exchanger, ASME H stamp, factory controls with LCD display and BACnet compatibility) - Replacement of HVAC pumps (base mounted, cast iron casing, bronze impellers, integral VFD with digital flow readout, packaged pump/VFD/controller unit as scheduled or equivalent) - Installation of fuel-fired domestic water heaters (sealed combustion, condensing, glass-lined heat exchanger, ASME labeled, low NOx burner) - Replacement and installation of valves (plumbing and HVAC), meters, gauges, insulation (elastomeric and fiberglass), hangers, supports, vibration isolation, and electrical modifications (conductors, cables, raceways, boxes) - Services Required: - Full test and balance, commissioning support, and water quality testing for compliance with manufacturer requirements - Construction services including mechanical, electrical, and plumbing work - Notable Requirements: - Compliance with Missouri Prevailing Wage Laws - MBE/WBE/DBE participation goals and E-Verify participation - Performance and payment bonds, bid security - Coordination with the college to minimize disruption during construction - Warranty periods of at least one year for work and equipment, with some boiler components warrantied up to 10 years - ChemAqua is the college's water treatment provider - Trane is the controls contractor for BAS programming and integration (by others) - No specific OEMs are named for boilers or pumps; bidders may propose equivalent products from approved manufacturers - Place of Performance: - Ozarks Technical Community College Springfield Campus, 1001 E Chestnut Expressway, Springfield, MO 65802 - College Facilities Office, 933 E. Central Avenue, Springfield, MO 65802 - Interpres Building Solutions, 1201 S Campbell Ave., Springfield, MO 65807 - Project Duration: - Construction expected to begin in early June and complete by the end of June (approximately one month), with flexibility as coordinated with the college

Description

This solicitation is for the replacement of boilers, pumps, piping, and specialties in the boiler room at the NKM building of Ozarks Technical Community College in Springfield, Missouri. The project includes reconnection to the existing building supply and return loops, with construction expected to start in June 2026 and complete by the end of June 2026. A pre-bid meeting and site walk are scheduled for March 31, 2026, and bids are due by April 7, 2026. The project requires compliance with Missouri prevailing wage laws and includes detailed bid submission requirements and contract conditions.