City of Eureka Annual Sewer Lateral Replacement Project 2025

Posted

April 28, 2025

Respond By

May 20, 2025

Identifier

2025-8

NAICS

237110, 237310, 237990

This opportunity involves the City of Eureka's Annual Lateral Replacement Project 2025, focused on municipal sewer infrastructure upgrades: - Government Buyer: - City of Eureka, Engineering Department (local government) - Scope of Work: - Replacement of approximately 70 sanitary sewer laterals at various locations throughout Eureka, California - Includes both excavation and approved trenchless methods - Associated work: asphalt grinding, paving, and replacement of wye connections to the main sewer line - Products/Services Requested: - Lateral Replacement – Short Shallow (8 units) - Lateral Replacement – Short Deep (27 units) - Lateral Replacement – Long Shallow (7 units) - Lateral Replacement – Long Deep (25 units) - Lateral Replacement – Alley, Non-Paved (3 units) - Asphalt Grinding and Paving (1,397 units) - Replace Wye Connection to Main (1 unit) - Technical Details: - All laterals: 4" PVC SDR35 sanitary sewer pipe - Work includes all labor, equipment, materials, excavation, de-watering, shoring (as needed), asphalt/concrete removal and replacement, and site restoration - Unique/Notable Requirements: - Compliance with Caltrans Standard Specifications - Valid California Class A contractor's license and DIR registration required - Prevailing wage applies - Payment and performance bonds required - Detailed safety, traffic control, and environmental compliance specifications - Estimated Construction Cost: - Approximately $1,000,000 - No specific OEMs are named, as the project is construction-based and not equipment-specific.

Description

The City of Eureka is soliciting sealed proposals for the Annual Lateral Replacement Project 2025, which involves the replacement of approximately 70 sewer laterals at various locations throughout the city. The project includes excavation or approved trenchless methods for lateral replacement and associated asphalt grinding and paving. Bids must be submitted by May 20, 2025, and a non-mandatory pre-bid meeting is scheduled for May 8, 2025. The estimated construction cost is around $1,000,000, and the project is expected to be completed within 120 calendar days from the start date.

View original listing