Opportunity
City of Sacramento PlanetBids #PN: W14150704 B26141324008
Sacramento St Lukes Detention Basin Project Construction Solicitation
Posted
April 03, 2026
Respond By
April 29, 2026
Identifier
PN: W14150704 B26141324008
NAICS
237110, 237990
This opportunity involves the City of Sacramento's Department of Utilities seeking bids for the construction of the St Lukes Detention Basin Project: - Government Buyer: - City of Sacramento, Department of Utilities, Engineering & Water Resource Division, Engineering Services Division - OEMs and Vendors: - Advanced Drainage Systems, Inc. (ADS) specified for 36-inch Triple Wall Sanitite HP storm drain pipe - No specific OEMs named for vault, fencing, or gates - Products and Quantities: - Precast concrete vault (1 unit) - 36-inch ADS Triple Wall Sanitite HP storm drain pipe (approx. 400 linear feet) - Standard manhole (1 unit) - Pipe inlet/outlet structure (1 unit) - Wrought iron double swing gate (1 unit) - Chain link fence (approx. 875 linear feet) - Double leaf chain link swing gates (1 unit) - Detention basin access ramp and low flow channel (approx. 1,740 sq ft) - Asphalt entrance driveway (approx. 360 sq ft) - Concrete sidewalk driveway (approx. 230 sq ft) - Services Requested: - Site clearing, grubbing, and excavation (approx. 10,500 cubic yards) - Tree removal (10 units) - Utility potholing (7 locations) - Haul-off and disposal of excess excavated material (approx. 14,200 cubic yards) - Hydroseeding and soil stabilization (approx. 50,000 sq ft) - Traffic control, mobilization, and demobilization - Site and right-of-way restoration - Unique or Notable Requirements: - California Class A contractor license required - Compliance with prevailing wage laws and City’s Construction & Demolition Debris Recycling Requirements - Local Business Enterprise (LBE) participation goals - Liquidated damages of $1,500 per working day for delays - Bonds and insurance required within 10 days of award - Place of Performance: - 7595 Center Parkway, Sacramento, CA 95823 (project site) - City Hall and Department of Utilities offices for administrative purposes
Description
This project involves the installation of a custom precast vault and connection to an existing storm drain pipeline, along with the installation of approximately 400 linear feet of storm drain pipe. The scope includes construction of a detention basin, inlet/outlet structures, drive ramp, low-flow channel, security fencing, gates, asphalt access driveway, aggregate base road, and site restoration. The work requires clearing, grubbing, excavation, and modification of existing fencing. The contract duration is 105 working days with liquidated damages of $1,500 per working day. A pre-bid meeting is scheduled for April 15, 2026, and bids are due by April 29, 2026.