Opportunity
CanadaBuys #20136340
Replacement of Plumbing Networks at École de Boischatel (du Bois-Joli), Québec
Posted
April 02, 2026
Respond By
April 28, 2026
Identifier
20136340
NAICS
238220, 237110, 237990
This opportunity involves the replacement of plumbing networks at École de Boischatel (du Bois-Joli) in Boischatel, Québec, managed by the Centre de services scolaire des Premières-Seigneuries. - Government Buyer: - Centre de services scolaire des Premières-Seigneuries (school service center) - Scope of Work: - Replacement of plumbing supply and discharge systems - Installation of new water heater and piping - Replacement of sinks and accessories - Demolition and reinstallation of heating ducts - Oil tank relocation - Pipe insulation - Equipment control and programming - Electrical disconnections and connections - Concrete work, excavation, and structural reinforcement - Coordination, demolition, painting, and flooring - Implementation of safety measures - Contractor Requirements: - Contractors or subcontractors must hold a plumbing sub-category 15.5 license during submission and throughout the project - OEMs and Vendors: - No specific OEMs, brands, or part numbers are mentioned - Period of Performance: - Estimated duration is 12 months - Location: - Work to be performed at École de Boischatel (du Bois-Joli), Boischatel, Québec - Procurement managed from Centre de services scolaire des Premières-Seigneuries office - Unique Requirements: - Comprehensive electromechanical and construction scope - Mandatory licensing for plumbing work
Description
Le Centre de services scolaire des Premières-Seigneuries is seeking a general contractor for the replacement of plumbing networks at the École de Boischatel (du Bois-Joli) located in Boischatel, Québec. The work includes electromechanical tasks such as replacing plumbing supply and discharge, water heater and piping, sinks and accessories, demolition and reinstallation of heating ducts, oil tank relocation, pipe insulation, equipment control and programming, electrical disconnections/connections, concrete work, excavation, structural reinforcement, coordination, demolition, painting, flooring, and safety measures. The contractor or subcontractor must hold plumbing sub-category 15.5 during submission and throughout the work. The contract duration is estimated at 12 months.