Opportunity

New Brunswick Opportunities Network #W-2026-006

Engineering Design and Construction Management for Well House and Raw Water Transmission Mains – Rothesay, NB

Posted

April 01, 2026

Respond By

April 07, 2026

Identifier

W-2026-006

NAICS

541330, 237110, 237990

The Town of Rothesay is initiating a procurement for consulting engineering services to design and manage construction of a new well house and raw water transmission mains at 4 McGuire Road. - Government Buyer: - Town of Rothesay, represented by the Director of Operations - OEMs and Vendors: - No specific OEMs or product vendors are named; the opportunity is for consulting engineering firms - Products/Services Requested: - Comprehensive engineering design and construction management services for a new well house and raw water transmission mains - Includes site surveys, preliminary and detailed design, tender support, construction management, inspection, and record drawings - Architectural, structural, mechanical, electrical, instrumentation, and civil engineering disciplines required - Preparation of design drawings, tender documents, materials testing, quality assurance, and O&M manuals - Unique or Notable Requirements: - Compliance with the National Building Code of Canada (post-disaster rating) - All engineering personnel and firms must be certified and in good standing with APEGNB - Consultant responsible for obtaining all permits and approvals prior to construction - Coordination with Town staff, utilities, and agencies for traffic planning and utility marking - Record drawings due after construction completion - Place of Performance and Delivery: - Main project site at 4 McGuire Road, Rothesay, NB - Additional relevant locations include 28 McGuire Road and the Town of Rothesay offices

Description

The Town of Rothesay is soliciting proposals from qualified consulting engineering firms to design and manage the construction of a new combined well house and raw water transmission mains at 4 McGuire Road. The project includes the design of a building to house control systems for two new bedrock wells with space for a future third well, installation of raw water piping, and associated infrastructure. The consultant will be responsible for preliminary and detailed design, construction management, inspection, and coordination with utilities and agencies. Proposals must be submitted by April 7, 2026.

View original listing