Opportunity

CanadaBuys #20135866

Resurfacing and Related Works in Montréal for Cité de Dorval (2026)

Posted

April 01, 2026

Respond By

April 22, 2026

Identifier

20135866

NAICS

237310, 237110, 237990

This opportunity involves resurfacing and related infrastructure works for the Cité de Dorval in Montréal, scheduled for 2026. - Government Buyer: - Cité de Dorval (municipal government) - Scope of Work: - Pavement decohesion and resurfacing on avenue Roy (between 6th Avenue and avenue Dawson, excluding avenue Carson) and chemin Herron (between avenue Oakville and avenue Elmridge) - Replacement of damaged frames, covers, grates, concrete heads, and rings - Installation of adjustable frames - Replacement of conventional catch basins with sidewalk catch basins - Curb and sidewalk repairs - Management and disposal of generated materials - Sewer works as needed - Special reconstruction of a 600 mm TTOG pipe and related connections near 750 avenue Dawson, based on plans by Équipe Laurence - Unique Requirements: - The 600 mm TTOG pipe reconstruction is due to poor underground infrastructure conditions identified during prior decontamination - Plans for this portion were developed externally - No specific OEMs, vendors, or part numbers are mentioned in the notice - Estimated contract duration is 5 months

Description

This solicitation is for resurfacing and related works scheduled for 2026 in Montréal, specifically on avenue Roy between 6th Avenue and avenue Dawson, excluding the segment on avenue Carson, and on chemin Herron between avenue Oakville and avenue Elmridge. The scope includes pavement decohesion and resurfacing, replacement of damaged frames, covers, grates, concrete heads, and rings, installation of adjustable frames, replacement of conventional catch basins with sidewalk catch basins, curb and sidewalk repairs, and management of generated materials. Additionally, sewer works will be conducted as needed, and specific reconstruction of a 600 mm TTOG pipe and related connections will occur near 750 avenue Dawson due to poor underground infrastructure conditions revealed by prior decontamination work. The contract duration is estimated at 5 months.

View original listing