Opportunity

Braintree Civic Plus #RFQ

Installation Labor for Irrigation Control Retrofit at Braintree Municipal Golf Course

Posted

March 18, 2026

Respond By

April 01, 2026

Identifier

RFQ

NAICS

238210

The Town of Braintree, Massachusetts is seeking qualified vendors to provide installation labor for an Irrigation Control Retrofit at the Braintree Municipal Golf Course. - Government Buyer: - Town of Braintree, Director of Golf Operations, Braintree Municipal Golf Course - Scope of Work: - Installation labor only; all materials (including Rain Bird and 3M components) are provided by the Town - Wire installation using vibratory plow (16,000 linear feet) - ICM retrofit and sprinkler connection (150 units) - Enhanced grounding unit installation (10 units) - Central interface (ICI+) grounding (1 lump sum) - Turf restoration and site cleanliness required - Digital mapping of ICMs and system integration - Products (Owner-Provided): - Rain Bird ICSD lightning surge arrestors - 4" x 36" x 0.0625" copper grounding plates - 5/8" x 8' copper-clad ground rods - Non-migrating Ground Enhancement Material (GEM) - #10 AWG solid bare and insulated copper wire - 4-inch perforated drain pipe with grated caps - 10-inch round valve boxes - 3M DBR/Y-6 splice kits - Notable Requirements: - Strict wire installation and grounding standards - Compliance with Massachusetts Prevailing Wage Laws - Cost of bonds and permits must be included - Manufacturer warranties required on all installed parts - All products must be new and unused - Vendors may be required to perform product demonstrations or tests - Award will be made to the lowest responsive and responsible bidder - Period of performance: Spring to mid-May, normal work hours, no option years

Description

The Town of Braintree is seeking quotes from qualified vendors for an Irrigation Control Retrofit project at the Braintree Municipal Golf Course. The scope includes installation labor for wire pulling, ICM retrofit and sprinkler connection, grounding installation, and system integration. The project requires compliance with Massachusetts Prevailing Wage Laws and includes specific technical and restoration standards. Quotes are due by April 1, 2026, and must include costs for bonds and permits.

View original listing