Opportunity

State Port Authority Alport #11411

Alabama Port Authority Choctaw Point Container Terminal Phase V Dock Extension – Construction and Electrical Systems

Posted

February 06, 2026

Respond By

April 09, 2026

Identifier

11411

NAICS

237990, 238210, 238910

The Alabama Port Authority is seeking qualified contractors for the Phase V Dock Extension at the Choctaw Point Container Terminal in Mobile, Alabama. - Government Buyer: - Alabama Port Authority (state agency) - OEMs and Key Vendors: - ArcelorMittal (crane rails) - Cavotec (Super Panzerbelt cable trench system) - Gantrex (cable trench) - Trelleborg Marine Systems North America (bollards) - TekMarine (mooring bollards and fendering) - Siemens, ABB, General Electric, Cutler Hammer (medium voltage switchgear) - Trayer (medium voltage switches) - Products and Materials Requested: - Combination steel walls (2,602 LF), concrete bearing and batter piles (over 100,000 LF combined), closure walls, and timber curbs - Crane rail system (2,600 LF, 171 lb/yd profile, steel grade 110 Cr-V), including welding and installation - Panel fender system (32 units), mooring bollards (16 x 90 ton, 5 x 225 ton, Trelleborg MSB-100/MSB-250), and anchor bolt assemblies - Cable protection/trench system compatible with Cavotec Super Panzerbelt - Medium voltage switchgear (2 x 30 MVA, 22.9kV), crane substations (C3, C4), Trayer MV switches, transformers, and accessories - Concrete paving, fencing, drainage, water systems, and pavement markings - Temporary light poles (7 units), electrical manholes, ductbanks, and communication infrastructure - Services Requested: - Demolition of existing structures (sheet pile walls, conveyors, buildings, drainage, electrical) - Earthwork, grading, fill, and coal removal (30,000 CY) - Installation of all electrical distribution infrastructure, including factory-certified startup and training - Paving, fencing, and all related marine and upland construction activities - Unique/Notable Requirements: - Compliance with ASTM, AREMA, AWS, ANSI, NEMA, IEEE, UL standards - Environmental and protected species construction conditions (NOAA Fisheries) - Use of specific concrete mixes, epoxy bonding agents, and specialized coatings - Full-scale load deflection tests on fender elements - Crane rail system and cable trench must interface with existing Cavotec Super Panzerbelt system - Detailed sequencing for demolition and construction; mandatory pre-bid meeting - No small/disadvantaged business set-aside - Place of Performance: - Choctaw Point Container Terminal, Mobile, Alabama - Some materials delivered to Logistics Park on Baker Street, Mobile, AL - Oversight/coordination with NOAA Fisheries Southeast Regional Office (St. Petersburg, FL)

Description

This solicitation is for the Phase V Dock Extension at Choctaw Point Container Terminal in Mobile, Alabama. The project involves demolition of existing structures including sheet pile walls, removal of riprap and coal, and construction of new dock facilities including concrete piles, crane rails, fender systems, and electrical distribution. Prospective bidders are required to attend a pre-bid meeting and review detailed specifications and plans provided in multiple addenda. The bid opening is scheduled for April 9, 2026.

View original listing