Opportunity
Howard County Office of Procurement PlanetBids #140213
Howard County Fuel System and EV Charging Upgrade at Long Reach Fire Station No. 9
Posted
March 30, 2026
Respond By
May 13, 2026
Identifier
140213
NAICS
237120, 236220, 238210, 238220, 238290
Howard County is seeking qualified construction firms for a comprehensive fuel system and EV charging infrastructure upgrade at Long Reach Fire Station No. 9. - Government Buyer: - Howard County (local government) - Project location: Long Reach Fire Station No. 9, Columbia, MD - Products and Services Requested: - Removal of two existing 2,500-gallon underground storage tanks (USTs) and associated accessories - Installation of two new 12,000-gallon double wall fiberglass USTs with accessories - New fuel dispensers and accessories - Installation of a 1,000-gallon oil water separator with outlet piping - Construction of a new canopy and foundation (including complete design) - Installation of a fuel island with accessories - Double wall underground fuel and vent piping (approx. 200 linear feet) - Fuel tank access covers rated for H20 loading - Three observation wells - Twelve steel bollards for protection - Hot mix asphalt paving and concrete sidewalk installation - Furnishing and installation of electric vehicle (EV) charging stations - Electrical and communication connections for both fuel and EV systems - Storm drainage improvements - Construction stakeout, mobilization, and demolition of existing fuel piping and vent risers - Unique or Notable Requirements: - Complete design and construction of the canopy and foundation - Integration of EV charging infrastructure with new and existing systems - Project must be completed within 150 calendar days - Bid security required (5% of total bid) - SHA Cost Group "D" classification - No specific OEMs or vendors are named for equipment or materials; bidders may propose suitable products meeting specifications.
Description
Howard County is seeking a construction firm to remove existing underground fuel storage tanks and install new tanks along with fuel dispensing equipment, electrical and communication connections, paving, storm drainage, canopy and foundation, fuel island accessories, and EV charging stations. The project includes complete design and construction work with a duration of 150 calendar days. Bidders must submit an electronic bid bond or certified check for 5% of the total bid and attend a pre-bid meeting. The estimated value falls under SHA Cost Group "D".