Opportunity
SAM #6982AF26B000002
Reconstruction of North Point Parking Lot in Pickstown, South Dakota
Buyer
Central Federal Lands Highway Division
Posted
March 31, 2026
Identifier
6982AF26B000002
NAICS
237310, 237990
The Federal Highway Administration, Central Federal Lands Division (Department of Transportation), is seeking contractors for the SD FLAP SDGFP PARKING(1) project to reconstruct the North Point Parking Lot near Pickstown, South Dakota. - Scope of work includes: - Removal and excavation of existing asphalt and base to a depth of 9.5 inches - Placement of 3.5-inch asphalt pavement on 6 inches of aggregate base - Subexcavation to remove poor subgrade soils - Adjustments for ADA-compliant handicap parking stall - Installation of a concrete pad for a dumpster - Signing and striping - Principal work items and quantities: - 5,700 cubic yards of roadway excavation (20401-0000) - 3,000 cubic yards of subexcavation (20402-0000) - 3,800 tons of roadway aggregate (30202-2000) - 2,300 tons of asphalt concrete pavement (40301-0000) - No specific OEMs or vendors are named in the notice - Full and open competition procedures will be used - Work will be performed at North Point Recreation Area near Pickstown, South Dakota
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NUMBER: SD FLAP SDGFP PARKING(1)
PROJECT NAME: NORTH POINT PARKING LOT
PROJECT DESCRIPTION: The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area.
SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot’s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities.
PRINCIPAL WORK ITEMS:
20401-0000 Roadway Excavation: 5,700 CUYD 20402-0000 Subexcavation: 3,000 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,800 TON 40301-0000 Asphalt Concrete Pavement, 2,300 TON
ANTICIPATED SCHEDULE:
Advertisement – March 2026
Award – May 2026
NTP – June 2026
Contract Completion – September 2026
ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
This will be solicited using full and open competition procedures.