City of Bettendorf Seeks Bids for 2026 Leach Park Trail Resurfacing Project
Posted
March 31, 2026
Respond By
April 14, 2026
Identifier
2026-0008
NAICS
237310
The City of Bettendorf, Iowa is seeking bids for the 2026 Leach Park Trail Resurfacing Project, managed by the Engineering Division of the Public Works Department. - Government Buyer: - City of Bettendorf, Iowa (Engineering Division, Public Works Department) - Project Scope: - Pavement and sidewalk removal (417 units) - Installation of granular subbase (417 units) - Street patching and 8" PCC repair patches (61 units) - Sidewalk replacement with 6" PCC (3,201 units) - Trail resurfacing with Hot Mix Asphalt (HMA), including hand-applied and standard traffic surface (235 units total) - Application of Gilsonite Emulsified Asphalt Sealant (177 units) - Subgrade treatment with engineering fabric (55 units) and crushed rock stabilization (10 units) - Installation of detectable warning devices (40 yellow, cast-in-place plastic tiles from Armor Tile Tactile Systems or equivalent) - Removal of bollards and foundations (6 units) - Topsoil placement (340 units), sod and fertilizer (340 units), and minor manhole adjustment (1 unit) - Notable Requirements: - Strict compliance with SUDAS and City of Bettendorf Supplemental Specifications - No vibratory compacting allowed on the levee - Coordination with multiple utility companies required - Contractor must submit a critical path work schedule for approval - All bids must be submitted electronically; no paper, email, or fax submissions accepted - Performance and maintenance bonds required; $500/day liquidated damages for late completion - OEMs and Vendors: - Armor Tile Tactile Systems (for detectable warning devices) is the only specified OEM; equivalents are allowed - Place of Performance: - All work to be performed within the City of Bettendorf, Iowa, specifically at Leach Park Trail and related city locations
Description
The City of Bettendorf, Iowa, is soliciting bids for the 2026 Leach Park Trail Resurfacing Project. The project includes pavement removal, installing granular subbase, street patching, sidewalk replacement, resurfacing a trail with Hot Mix Asphalt (HMA), and related work. Construction is scheduled to commence on or after April 27, 2026, and must be completed by August 1, 2026, with liquidated damages of $500 per day for delays. Bids must be submitted electronically through the City's bidding system by April 14, 2026.