Opportunity

City of Upper Arlington Ionwave #UA26-20 Addendum 3 (Pedestrian Bridge Replacement)

Upper Arlington Pedestrian Bridge Replacements at Miller Park and Smith Nature Park

Posted

March 11, 2026

Respond By

March 31, 2026

Identifier

UA26-20 Addendum 3 (Pedestrian Bridge Replacement)

NAICS

237310

This opportunity involves the City of Upper Arlington seeking bids for the replacement of pedestrian bridges at Miller Park and Smith Nature Park. - Government Buyer: - City of Upper Arlington, Division of Purchasing, Parks & Recreation Department - OEMs and Vendors (Prefabricated Truss Bridges): - Contech Engineered Solutions - Pioneer Bridges - TrueNorth Steel - Wheeler - BCS Fabrication - Bridge Brothers Inc. - Products and Services Requested: - Replacement of two pedestrian bridges at Miller Park (base bid) - Replacement of one pedestrian bridge at Smith Nature Park (alternate) - Prefabricated Pratt truss bridges (single-span steel superstructures) - Miller Park North: 14'-6" span, 5'-0" roadway - Miller Park South: 20'-0" span, 5'-0" roadway - Smith Nature Park: 30'-0" span, 6'-0" roadway - IPE hardwood decking (2x6, FSC certification not required) - Reinforced concrete abutments with spread footings (precast acceptable) - Rock channel protection, Type D, 1'-6" thick - Compacted aggregate and excavation work - Removal of existing structures (timber decks, railings, abutments, piers) - Cofferdams and excavation bracing - Design, fabrication, shipping, and erection of bridges and components (including safety rails, handrails, bearings, expansion joint steel plates, and decks) - Unique or Notable Requirements: - Qualified bridge fabricators must have at least five years of experience and references for five successful bridge projects - Compliance with prevailing wage laws and the City of Upper Arlington Affirmative Action Program - All labor, materials, and equipment for complete bridge and abutment installation included - Bonds, insurance, and adherence to environmental regulations required - Locations: - Miller Park, 1903 Arlington Avenue, Upper Arlington, OH 43221 - Smith Nature Park, Upper Arlington, OH - City of Upper Arlington Division of Purchasing, 3600 Tremont Road, Upper Arlington, OH 43221 (contracting office) - Period of Performance: - Work must be completed within 240 calendar days from Notice to Proceed; one-year guarantee period after acceptance

Description

The City of Upper Arlington is soliciting sealed bids for the replacement of pedestrian bridges at Miller Park and Smith Nature Park. The project includes replacing two pedestrian bridges at Miller Park as the base bid and an additional bridge at Smith Nature Park as an alternate. The work involves prefabricated Pratt truss bridges supported on reinforced concrete abutments, with specific design and material requirements detailed in the bid documents. An optional pre-bid meeting is scheduled, and bids are due by March 31, 2026.

View original listing