Opportunity
City of Farmington Ionwave #26-165227 Addendum 5
Summit Drive Waterline Replacement Project – City of Farmington, NM
Posted
December 22, 2025
Respond By
February 11, 2026
Identifier
26-165227 Addendum 5
NAICS
237110
This opportunity involves the City of Farmington, New Mexico's Public Works Department awarding a contract for the Summit Drive Waterline Replacement project. - Government Buyer: - City of Farmington, New Mexico (Public Works Department, Purchasing Division) - OEMs and Vendors: - No specific OEMs are named; standard waterworks materials and equipment are required - Awarded contractor: TRC Construction Inc. (Flora Vista, NM) - Products/Services Requested: - Replacement of approximately 1,520–1,585 feet of 6-inch cast iron water main with new 8-inch PVC water main (DR-18) - Replacement of customer service lines - Installation of: - 8" and 6" PVC water main (DR-18) - Gate valves (4", 6", 8", 10", 12") with boxes - Iron fittings (12" diameter and under) - Megalugs (6" and 8", ductile or PVC) - Fire hydrants (4', 5', or 6') - Air relief valve assemblies with vaults (for 8" pipe) - Pressure reducing vaults, tees, crosses, reducers, bends, plugs, sleeves - Water service connections (5/8" or 1") - Pipe bedding, base course, hot mix asphalt, curb/gutter, sidewalk, drivepad restoration - Traffic control, mobilization/demobilization, removal/disposal of old pipes and fittings - Unique or Notable Requirements: - Compliance with New Mexico Department of Workforce Solutions registration and prevailing wage rates - Drug-free workplace policy and proper contractor licensing - Street cut permit required; street closures and resident notification during construction - Pressure and bacteriological testing of all water services up to the curb stop - Project scheduled to minimize impact on school traffic - Liquidated damages for late completion ($1,000 per day) - Estimated Contract Value: - Awarded at $476,467.07 (plus taxes); estimated project cost up to $532,000 - Period of Performance: - Approximately 45 calendar days (about 1 month and 20 days) - Place of Performance: - Summit Drive, from Sunset Avenue to 20th Street, Farmington, NM
Description
The City of Farmington, New Mexico is soliciting bids for the Summit Drive Waterline Replacement project. The work involves furnishing all labor, equipment, and materials to replace an old 1,520-foot, 6-inch cast iron water main line and customer service lines with new 8-inch PVC lines. The project includes excavation, installation, connection to existing water systems, and restoration of disturbed areas. Engineering and contract documents were completed by the City of Farmington.