Opportunity

Redwood City Granicus #ENG26-08

Engineering Consulting for Carson Potable Water Pump Station Replacement

Posted

March 27, 2026

Respond By

April 18, 2026

Identifier

ENG26-08

NAICS

541330, 541370

The City of Redwood City is soliciting proposals for engineering consulting services to replace the Carson Potable Water Pump Station. - Government Buyer: - City of Redwood City, Engineering & Transportation Department - Project Scope: - Full design, plans, specifications, and cost estimates for replacing the existing potable water pump station - Demolition and replacement of the pump house building, pumps, and associated equipment - Replacement of approximately 1,000 linear feet of 10-inch ductile iron pipe with a new 12-inch pumping line (pipe material alternatives to be evaluated) - Installation of new vertical multi-stage centrifugal pumps with Variable Frequency Drives (VFDs) - New masonry pump house with emergency generator and exterior fuel filling system - Upgraded electrical systems, including new motor control center (MCC), switchgear, automatic transfer switch (ATS), portable generator receptacle, AC unit, exhaust fans, surveillance cameras, and exterior lighting - SCADA, instrumentation, and controls: PLC programming, integration, instrumentation, network router, radio communications, and fiber optic wiring - Site improvements: driveway, fencing, slope stabilization, erosion control, tree removal/pruning, concrete walk, and landscape restoration - Services Required: - Hydraulic and structural analysis, electrical and SCADA design, permitting, bid support, construction observation, submittal reviews, testing, and as-built drawings - Support during bidding and construction phases, including technical Q&A and meetings - Notable Requirements: - Consultant must demonstrate expertise in hydraulic analysis, SCADA integration, electrical systems, and civil/structural design - Consultant to present pipe material alternatives for the new pumping line - No specific OEMs or vendors are named in the solicitation - Place of Performance: - 3585 Farm Hill Boulevard, Redwood City

Description

The City of Redwood City is seeking proposals from qualified firms to design and develop plans, specifications, and cost estimates for the Carson Potable Water Pump Station Replacement Project. The scope includes engineering consulting services during bidding and construction phases. The project involves removal and replacement of the existing pump house building, pumps, associated equipment, piping, electrical and communication systems, and site improvements such as driveway, fencing, and erosion control. The consultant must have expertise in hydraulic analysis, structural design, electrical systems, and related disciplines.

View original listing