Opportunity

Saskatchewan Tenders #HWY-B26009

Construction and Replacement of Short Span Bridges on Highways 980 and 982, Saskatchewan

Posted

March 19, 2026

Respond By

April 09, 2026

Identifier

HWY-B26009

NAICS

237310, 237990, 238190, 238120

This opportunity involves the construction and replacement of short span bridges on Highway 980 over Midnight Creek and Highway 982 over Swan River, south of Hudson Bay, Saskatchewan. - Government Buyer: - Province of Saskatchewan, Ministry of Highways / Ministry of SaskBuilds and Procurement - Scope of Work: - Construction of two short span bridges, including: - Precast prestressed concrete stringer erection - Supply and installation of steel pipe piling (576 meters) - Granular backfill at bridges (908 cubic meters) - Foundation excavation - Dismantling of existing timber bridges - Site and slope restoration - Supply and installation of miscellaneous steel, precast concrete abutment caps, and structural plate corrugated steel - Placement of riprap (66 cubic meters) - Supply and installation of side mounted steel bridgerail (72 meters) - Concrete for piling (44 cubic meters) - Granular filter blanket (33 cubic meters) - Traffic gravel supply and hauling (64 tonnes) - Design, construction, maintenance, and removal of temporary detours - Traffic accommodation and mobilization - Site occupancy charged at $1,000 per day (up to 70 days) - Notable Requirements: - Compliance with environmental and navigability permits - Occupational health and safety requirements - 12-month warranty for ride quality and backfilling/surfacing defects - Liquidated damages of $1,000 per day and a $20,000 lump sum - 5% bid deposit and Saskatchewan business registration required - No specific OEMs or named vendors are identified; work involves standard bridge construction materials and methods.

Description

This solicitation is for the construction of short span bridges on Highway No. 980 over Midnight Creek and on Highway No. 982 over Swan River, located south of Hudson Bay, Saskatchewan. The work includes precast prestressed concrete stringer erection, supply and installation of piling, granular backfill at bridges, and other related bridge construction activities. Bidders must submit inquiries at least 3 business days before the bid closing date and may request a debriefing within 30 days after award notification. The project completion date is February 15, 2027, and a 5% deposit of the total bid is required with each tender submission.

View original listing