Opportunity

The Metropolitan Water District of Southern California PlanetBids #Specifications No. 2097

Slope Toe Improvements at Robert B. Diemer Water Treatment Plant Basin 8

Posted

March 17, 2026

Respond By

April 28, 2026

Identifier

Specifications No. 2097

NAICS

237990, 238910, 238990

The Metropolitan Water District of Southern California is seeking bids for improvements to the toe of the slope supporting Basin No. 8 at the Robert B. Diemer Water Treatment Plant in Yorba Linda, CA. - Scope of Work: - Excavation of existing ground material, keying and benching of subgrade, compaction, and restoration of the toe area with fill and rock rip-rap - Asphalt pavement restoration for the slope access road - Mobilization, import of fill materials, and all related appurtenant work as specified in project drawings and specifications (Specifications No. 2097) - Product and Service Line Items: - Mobilization (1 unit) - General construction for Basin 8 Toe Improvement (1 unit) - Additional excavation (100 cubic yards) - Import materials (500 cubic yards) - Cathodic protection components (graphite and magnesium anodes, cast iron lids/covers/frames) - Engineering services, security system installation, leak detection controls, instrumentation, and related electrical/mechanical work - Location: - All work will be performed at the Robert B. Diemer Water Treatment Plant, 3972 Valley View Ave, Yorba Linda, CA 92886 - Requirements: - California contractor license (A or C-12) required - Minimum 25% participation by Small Business Enterprise and Disabled Veteran Business Enterprise (SBE/DVBE) firms - Compliance with California Labor Code prevailing wage and registration requirements - Mandatory pre-bid conference attendance for prime bidders - Estimated Contract Value: - Between $820,000 and $1,050,000 - Period of Performance: - Work must be completed within 270 working days after Notice to Proceed - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation; standard construction and instrumentation components are referenced

Description

This solicitation is for the improvement of the toe of the slope supporting Basin No. 8 at the Robert B. Diemer Water Treatment Plant. The work includes excavation of existing ground material, keying and benching of the subgrade, compaction, restoration with fill and rock rip-rap, and asphalt pavement restoration for the slope access road. The project requires a California contractor license (A or C-12) and has an estimated value between $820,000 and $1,050,000. The contract duration is 270 working days, with a pre-bid meeting scheduled for April 8, 2026, and bids due by April 28, 2026.

View original listing