Opportunity

Washington Brementon Civic Plus #234-1896-196

Bremerton Stormwater Treatment Systems and Infrastructure Upgrade Solicitation

Posted

March 24, 2026

Respond By

April 14, 2026

Identifier

234-1896-196

NAICS

237110, 237310, 237990

This opportunity involves a major stormwater infrastructure upgrade for the City of Bremerton, Washington: - Government Buyer: - City of Bremerton, Public Works & Utilities - OEMs (Original Equipment Manufacturers): - Contech (Filterra stormwater treatment systems) - Modular Wetland Systems (stormwater treatment vault) - Products/Systems Requested: - Two Contech Filterra stormwater treatment systems - One Modular Wetland Systems vault - Approximately 1,400 linear feet of 18-inch diameter and larger stormwater pipes - Precast concrete treatment vaults and hydrodynamic separators - Hot mix asphalt for roadway reconstruction - Services Requested: - Temporary traffic control - Demolition and removal of existing infrastructure - Installation and replacement of stormwater pipes and catch basins - Grading and site preparation - Roadway reconstruction (including pavement markings, curb ramps, driveways) - Landscape and shoreline restoration (including mitigation at Smith Cove) - Notable Requirements: - Apprentice utilization - Bid and performance bonds - Compliance with equal employment and ADA standards - Estimated Contract Value: - $3,000,000 to $3,700,000 - Place of Performance: - East 9th Street Mini Park and Smith Cove, Bremerton, WA - Contracting office at Norm Dicks Government Center, Bremerton, WA - Period of Performance: - All work must be completed within 130 working days after the Notice to Proceed

Description

This project involves the installation of two Contech Filterra stormwater treatment systems and one Modular Wetland Systems vault, along with conveyance piping, roadway restoration, and stormwater outfall and shoreline restoration at the East 9th Street Mini Park and shoreline mitigation at Smith Cove in Bremerton, Washington. The scope includes temporary traffic control, demolition, removal and replacement of stormwater pipes and catch basins, grading, installation of precast concrete treatment vaults and hydrodynamic separators, roadway reconstruction with hot mix asphalt, pavement markings, curb ramps, driveways, and landscape restoration. The work must be completed within 130 working days after the commencement date. The engineer's estimate for the project ranges from $3.0 to $3.7 million.

View original listing