Clean Water Services is seeking bids for the Cedar Street Pump Station Improvements Project No. 7341 in Forest Grove, Oregon. - Government Buyer: - Clean Water Services (WRRD Engineering Division) - Contact: Michelle Mann, Program Support Specialist - Project Scope: - Demolition and removal of existing single-phase pumps, below-grade piping/valving, and electrical components (generator and control panel) - Civil site demolition and construction of concrete and generator slabs - Extension of new 480-volt three-phase power service from an existing Forest Grove Light & Power pole - Installation of new three-phase pumps, above-grade piping/valving, and associated instrumentation - Installation of new electrical components, conduits, and wiring - Installation of owner-supplied standby generator and automatic transfer switch - Contractor-procured control panel - Implementation of temporary erosion control and a bypass pumping system to maintain continuous wastewater pump station operation - Products/Services Requested: - Submersible Sewage Pumps (major equipment option: Xylem Flygt Model NX 6020-80) - Construction services for demolition, installation, and site work - Temporary erosion control and bypass pumping system - OEMs and Vendors: - Xylem (Flygt) is specified as a major equipment option for submersible sewage pumps - Unique/Notable Requirements: - Compliance with Oregon public works statutes (ORS 279C.800 to 279C.870) and prevailing wage rates - Mandatory registration with the Oregon Construction Contractors Board - Electronic bid submission via Equity Hubs’ Bid Locker - Liquidated damages for late completion - No asbestos involved - Voluntary pre-bid conference and site visit encouraged - Estimated Construction Cost: $546,000 - Key Locations: - Cedar Street Pump Station, 1065 Cedar Street, Forest Grove, OR (place of performance) - Rock Creek Water Resource Recovery Facility, Hillsboro, OR (delivery location) - Administration Building Complex, Hillsboro, OR (contracting office) - Forest Grove Water Resource Recovery Facility O&M conference room (pre-bid conference location)

Description

This Invitation to Bid (ITB) is for the construction of the Cedar Street Pump Station Improvements Project No. 7341 located at 1065 Cedar Street, Forest Grove, Oregon. The project scope includes demolition and removal of existing single-phase pumps and electrical components, civil site demolition, construction of concrete slabs, extension of new 480-volt three-phase power service, installation of new three-phase pumps and associated piping and instrumentation, installation of electrical components and wiring, installation of an owner-supplied standby generator and automatic transfer switch, and temporary erosion control and bypass pumping systems to maintain continuous operation. The estimated construction cost is $546,000. Bids are due by April 22, 2026, and must be submitted electronically via Equity Hubs’ Bid Locker.

View original listing

Get AI summaries, saved searches, and real-time alerts for new opportunities. Sign up free · Sign in