Opportunity

Palmdale Planet bids #139854

City of Palmdale 45th Street East Sewer, Storm Drain, and Street Improvements Solicitation

Posted

March 19, 2026

Respond By

April 20, 2026

Identifier

139854

NAICS

237110, 237310, 237990

This opportunity from the City of Palmdale Public Works Department seeks bids for major sewer, storm drain, and street improvements along 45th Street East. - Government Buyer: - City of Palmdale Public Works Department - Products/Services Requested: - Installation of 18-inch extra strength vitrified clay pipe (VCP) sewer relief line (5,280 linear feet) - Installation of 78-inch reinforced concrete pipe (RCP) storm drain mainline (1,915 linear feet) - Construction of various sizes of reinforced concrete pipes, boxes, and manholes - Installation of catch basins, storm drain manholes, and curbside grating catch basins - Street improvements including polymer modified asphalt concrete, sidewalks, curbs, gutters, signing, and striping - Utility adjustments and resetting monuments - Mobilization, demobilization, excavation safety, sewer bypassing, traffic control, construction information signs, as-built drawings, and post-construction CCTV inspection - Unique/Notable Requirements: - Compliance with Standard Specifications for Public Works Construction ("Greenbook") - Adherence to all relevant permits and regulations - Contractor must hold a valid Class A license - Strict safety measures for excavation and sewer bypassing - Compliance with Storm Water Pollution Prevention Plan (SWPPP) - Post-construction CCTV inspection required - No specific OEMs or vendors are named in the solicitation - Project duration is 251 working days - All bids must be submitted electronically

Description

This solicitation is for the 45th Street East Sewer, Storm Drain and Street Improvements Project located in Palmdale, California. The project involves installing an 18" sewer relief line, a 78" storm drain mainline, catch basins, storm drain manholes, polymer modified asphalt concrete, sidewalks, curbs, gutters, signing, striping, utility adjustments, and monument resetting. Construction must comply with the Standard Specifications for Public Works Construction and related plans. The project duration is 251 working days, with a pre-bid meeting on March 30, 2026, and bids due by April 20, 2026.

View original listing