Opportunity
Waterville Civicplus #57
Award for 2026 Paving and Sidewalk Projects in Waterville, ME
March 02, 2026
March 16, 2026
57
237310, 238990
This award summary covers the City of Waterville's 2026 paving and sidewalk improvement projects: - Government Buyer: - City of Waterville, Department of Public Works - OEMs and Vendors: - No specific OEMs are named; multiple paving contractors submitted bids, including Roundy's Paving LLC, Ranger Construction Corp, Maine-ly Paving Services LLC, and Littlefields Construction LLC - Products and Materials Requested: - Hot mix asphalt (9.5 mm and 12.5 mm, various uses and thicknesses) - Bituminous tack coat - Loam for landscaping - Seeding and mulch for restoration - Slip form concrete curb (as an alternate to bituminous curb) - New bituminous curb - Type A gravel for grading - Pavement butt joints, sawcut pavement, and removal of existing pavement/curb - Services Requested: - Milling and filling of existing pavement - Sidewalk and driveway pavement removal and replacement - Valve box adjustments (in coordination with Kennebec Water District) - Labor and equipment for excavation and trucking - Mobilization - Quantities: - Over 11,000 square yards of milling - Over 2,000 square yards of pavement butt joints - Over 5,400 linear feet of new curb (bituminous or slip form concrete) - Hundreds of tons of hot mix asphalt - Dozens of valve box adjustments - Unique or Notable Requirements: - Alternate pricing for slip form concrete curb - Coordination with Kennebec Water District for valve box adjustments, with specific notification periods - Work covers Summer Street, Grove Street, and associated sidewalks - Restoration of disturbed areas with loam, seeding, and mulch - Detailed line items and bid results are available in the attached PDF
Description
This solicitation is for paving projects scheduled for 2026 in the City of Waterville, Maine. The work includes milling, filling, hot mix asphalt application, pavement butt joints, valve box adjustments, sidewalk removal and replacement, and related tasks on Summer Street, Grove Street, and associated sidewalks. Multiple bid forms and addenda detail the scope, quantities, and alternate pricing options such as slip form concrete curb versus bituminous curb. The bid closed on March 16, 2026, and results are available in the attached PDF document.