Opportunity
Santa Barbara Planet bids #5113
Santa Barbara School Crosswalk Safety Upgrades – Construction and Electrical Infrastructure
March 20, 2026
April 09, 2026
5113
237310, 237130, 238210
This opportunity involves safety upgrades at three school crosswalks in Santa Barbara, CA: - Government Buyer: - City of Santa Barbara, Public Works Department Engineering Division - OEMs and Vendors: - Southern California Edison (SCE) is referenced as an OEM for electrical pull boxes and related components - Products and Services Requested: - Construction and installation of curb extensions, ADA-compliant access ramps with truncated domes, concrete sidewalks and driveways, and curb and gutter - Installation of Rectangular Rapid Flashing Beacons (RRFBs), lighting, and associated foundations - Electrical infrastructure including 3" conduit, Caltrans #6 pull boxes, and SCE pull boxes - Asphalt conform, topsoil grading with mulch, thermoplastic pavement markings, and striping removal - Demolition of existing foundations and relocation of mailboxes - Traffic control plan development and implementation, noise and dust control, and site cleanup - Unique or Notable Requirements: - Project duration is 30 calendar days with liquidated damages of $3,600 per day for delays - Requires a California Class A contractor's license and DIR registration - Work is at three specific intersections near Hope Elementary and Monte Vista Elementary Schools - Estimated construction cost is $300,000 - All bids must be submitted electronically via PlanetBids
Description
This solicitation is for the HSIP Cycle 12 Hope School District School Crosswalk Safety Project, which involves safety enhancements at three uncontrolled crosswalks near Hope Elementary and Monte Vista Elementary. The project scope includes curb extension enhancements, installation of Rectangular Rapid Flashing Beacons (RRFBs), lighting, and foundation installations at specified locations. The work includes various construction and electrical tasks such as concrete sidewalk and driveway construction, traffic control, and pavement marking. The estimated project duration is 30 days with liquidated damages of $3,600 per day for delays.