# Design Review Board Meeting 11.19.26

The City of Miami Beach Design Review Board met on November 19, 2026, and approved the prior meeting minutes before reviewing design applications. No procurement activity—such as contract awards, bids, or vendor selections—was identified. The board approved modifications to a previously approved private marina at 120 MacArthur Causeway, including gatehouse and driveway changes, moving the deadline for a coral-restoration educational program to before the certificate of occupancy, and correcting the destination fund’s name. The applicant stated that the required $230,000 contribution had already been paid. The board also approved revised signage for Compass Realty at 1212 Lincoln Road, excluding one Alton Road sign from the approval and requiring it to be relocated to the second-floor louver area; future signs must meet staff-reviewed standards for color, scale, and design. The signage motion passed with an opposing vote noted in the transcript.

Other approvals included a restaurant facade and interior renovation at 834 First Street; an elevator-related variance and design waiver for an existing residence at 1510 Stillwater Drive; design waivers and a setback variance for a new residence at 180 North Bay Road; and design approval and a rear-setback variance to legalize a canopy at the Standard Hotel, subject to conditions requiring removal of certain fixtures and equipment. The restaurant renovation approval was unanimous. Discussion noted that the restaurant’s operator and operating details remain subject to a future Planning Board hearing, and that the hotel canopy approval does not authorize use as an event space.

**Jurisdictions:** sled
**Industries:** Construction & Infrastructure
**Topics:** Physical Infrastructure
**Published:** November 20, 2026

### Sources
- [Design Review Board Meeting 11.19.26](https://www.youtube.com/watch?v=0lmw2KzEgpQ) - City of Miami Beach TV