# Oregon Planning Commission   November 12, 2026

The Oregon Planning Commission meeting on November 12, 2026, approved the October 1 minutes and considered several development applications. It recommended approval of Meridian Homes’ specific implementation plan for the Featherwood Net Trails neighborhood, subject to annexation; approved a revised site plan for Swinehart Plumbing’s building expansion, including a required dumpster enclosure; and approved the site plan for a rentable shelter building at Bethel Greenway Green Acre Park. The shelter design includes two single-stall restrooms and picnic facilities. These were land-use and site-plan decisions, not procurement awards.

The commission reviewed the draft 2026 Village of Oregon Water System Master Plan. The plan recommends replacing the North Standpipe with an approximately $4.6 million water tower and adding interzonal boosting capacity at existing well facilities, coordinated with planned well-house overhauls in 2030 and 2034. Earlier estimates put a new storage facility at $4–6 million and boosting at $1.7–2.4 million; the commission discussed potential effects on water rates, infrastructure redundancy, and future growth. A motion to recommend Village Board approval of the draft plan carried, with one member opposed. No bids, vendor selections, or contract awards were identified.

**Jurisdictions:** sled
**Industries:** Construction & Infrastructure, Energy & Utilities
**Topics:** Physical Infrastructure
**Published:** November 12, 2026

### Sources
- [Oregon Planning Commission   November 12, 2026](https://www.youtube.com/watch?v=bGooCoaSSZc) - OCAmedia