# Planning Commission Meeting 11 09 2026

The Greenwood, Indiana Plan Commission meeting on November 17, 2026, considered PC 2026-051, the Walker Farms primary plat proposed by Pulte Group. Pulte proposed replacing the previously approved mix of townhomes, duplexes, and detached homes with all detached single-family homes, widening some lots and reducing density. After public comment on cut-through traffic, drainage, and tree preservation, the Commission approved the plat 8–0, subject to staff conditions including finalization of the sanitary sewer route, compliance with prior commitments and applicable waivers, a Main Street no-access easement, and commercially reasonable efforts to preserve the tree line on the southwest parcel.

The Commission also approved two related street-connectivity waivers, each 8–0, allowing no vehicular connections to Faith Street, Lee Lane, and Green Valley Drive while retaining pedestrian and bicycle connectivity. Conditions include road and sidewalk improvements, a safe vehicle barricade, advance warning signage, and fire-department access or a temporary turnaround where required. The meeting included no procurement, contract awards, or spending decisions.

**Jurisdictions:** sled
**Industries:** Construction & Infrastructure
**Topics:** Physical Infrastructure
**Published:** November 17, 2026

### Sources
- [Planning Commission Meeting 11 09 2026](https://www.youtube.com/watch?v=-nU3wfp3lFk) - Greenwood Indiana