# Conservation Commission 10/8/2026

The Franklin Conservation Commission meeting on October 8, 2026, addressed several wetlands and infrastructure matters. For the emergency Nicholas Drive/Prospect Street culvert replacement, town staff reported that the work was completed in August and that EDR is contracted to prepare the retroactive Notice of Intent; GNH completed the survey. The project used funds encumbered from FY2026 and FY2027 without borrowing, and staff reported erosion controls and vegetation establishment. The town cited an estimated $1.2 million cost for a future non-emergency replacement of comparable scale and a $965,000 stormwater operating budget, and discussed seeking grants for other at-risk culverts. A separate $604(b) grant application for Populatic Pond was submitted, with an estimated amount mentioned unclearly in the transcript. Staff also reported an award to fund 10 beaver coexistence flow devices, with a 33% town match.

The commission continued the 110 Populatic Street and Nicholas Drive/Prospect Street hearings to October 22. It reviewed revised plans for 78 Populatic Street, including proposed town water and sewer connections, driveway work, tree protection, and mitigation; the hearing was continued to October 22, with a vote anticipated at a later meeting. The commission also ratified an emergency minor-buffer-zone approval for hazardous tree removal at 7 Shokimo Path, approved a certificate of compliance for 60 Spring Street Lot 1 (now 90 Spring Street), and ratified an enforcement order for 260 Daniel Street. No new contract award or spending authorization was voted on at this meeting.

**Jurisdictions:** sled
**Industries:** Environment, Construction & Infrastructure
**Topics:** Grants & Funding, Physical Infrastructure
**Published:** October 08, 2026

### Sources
- [Conservation Commission 10/8/2026](https://www.youtube.com/watch?v=FxDu-rCQvyc) - FRANKLIN TOWN HALL TV