# USCG Modernizes USCGC HEALY Systems

The U.S. Coast Guard is conducting an Industry Day on October 26-27, 2027, to engage vendors for modernization projects on the USCGC HEALY (WAGB-20). The focus is on upgrading the Deaerating Feed Tank, feedwater treatment, and boiler controls, alongside replacing the steering control system with a commercial off-the-shelf (COTS) PLC-based solution. These efforts aim to enhance operational reliability and control system integration, with prototype installations planned for fiscal year 2028.

- **Why this matters:** Procurement professionals and contractors have a timely opportunity to influence design and integration requirements during this market research phase.
- The modernization contracts will be awarded for FY2028, signaling upcoming solicitations and potential business opportunities.
- Companies specializing in marine engineering, control systems, and industrial automation should prepare to engage with USCG requirements.
- Early participation can position vendors favorably for prototype installation contracts and subsequent full-scale upgrades.

**Jurisdictions:** federal
**Industries:** Defense & Military
**Topics:** Physical Infrastructure
**Published:** September 18, 2026

### Government Entities
- United States Coast Guard (USCG)
- USCG Surface Forces Logistics Center Procurement Branch 2

### Sources
- [USCGC HEALY Industry Day: Deaerating Feed Tank and PLC-Based Steering Control System Modernization](https://app.govly.com/opportunities/17118858) - SAM