# Missoula Questcdn #10455365

Clay Street water main replacement and related hydrant and restoration work

**Posted:** November 27, 2026
**Respond By:** December 16, 2026
**Identifier:** 10455365
**NAICS:** 237110

The City of Missoula is seeking a contractor to replace part of the Clay Street water main and complete associated hydrant, connection, and surface restoration work.
- **Buyer:** City of Missoula, Montana; no specific department or office is identified.
- **Project:** Clay Street Water Main Replacement, between Kiwanis Street and Levasseur Street.
- **Requested work:**
  - Install approximately 286 linear feet of new water main and connect it to the existing system.
  - Replace a fire hydrant in the Holiday Inn parking lot west of Clay Street.
  - Abandon water main near the proposed hydrant and next to Pattee Street.
  - Reconnect water services and repair surfacing, with related work completed to the plans and specifications.
- **OEMs and vendors:** No manufacturers or procurement vendors are identified. Holiday Inn is referenced as a project location.
- **Notable requirements:** Construction must follow the project plans and specifications.

### Description

The project involves installing approximately 286 linear feet of new water main on Clay Street between Kiwanis Street and Levasseur Street, including tie-ins to the existing water main. It also includes replacing a fire hydrant in the Holiday Inn parking lot, abandonment work near the proposed hydrant and adjacent to Pattee Street, and surfacing repairs and service reconnections. Work must be performed in accordance with the plans and specifications. Electronic bids are due December 16, 2026, at 4:00 p.m. local time, and a mandatory remote pre-bid conference is scheduled for December 8, 2026.

[View original listing](https://qcpi.questcdn.com/cdn/posting/?projType=all&provider=6092378&group=6092378)
