# Utah Public Procurement Place U3P #PRK23041

Rose Park Golf Course irrigation replacement, pump-station work, and turf reduction

**Posted:** November 28, 2026
**Respond By:** December 16, 2026
**Identifier:** PRK23041
**NAICS:** 237110, 561730

Salt Lake City is seeking construction to replace irrigation and reduce turf at Rose Park Golf Course, including pond and pump-station work.
- **Government buyer:** Salt Lake City Corporation, Department of Public Services, Architecture and Construction Management Division; project documents also identify the Department of Public Lands, Parks Division / Public Lands Golf Division.
- **Project:** Rose Park Golf Course Irrigation and Turf Reduction (PRK23041), at 1386 N Redwood Road, Salt Lake City, Utah.
- **Construction scope:** Abandon existing irrigation components while protecting playable turf; install new mainline, service feeds, laterals, heads, controls, pump station, wet well, piping, and electrical work; build a two-stage settling pond with a drivable bottom, clay-sealed liners, and inlet/outlet structures; install Grasscrete paving; and restore areas with native seeding.
- **Named OEMs and products:** **Toro** irrigation controls, heads, valves, and accessories; **Aqua Fuse** HDPE pipe and fittings; **Grasscrete** paving system; **Dayton Superior** concrete curing compound; **Propex** concrete fibers; **Helix Color Systems** optional concrete color; **Cultec** filter fabric; **Carson** valve boxes; **Bermad** air-relief valves; **Paige** irrigation cable and grounding products; **Fluke** and **Reed Instruments** electrical test equipment.
- **Seed quantities:** 1,620,254 SF of non-irrigated wheatgrass mix and 19,567 SF of wetland seed mix. Seed species and mixes are specified in the plans; the wheatgrass seeding rate is 6 lb per acre.
- **Other named organizations:** Prequalified contractors are Mid-America Golf & Landscape, Inc., Wagner Golf Works LLC, and Heritage Links. Rocky Mountain Power coordination is required.
- **Notable requirements:** Substantial completion within 240 calendar days after Notice to Proceed, including winter shutdown days; tree protection; irrigation testing, commissioning, operator training, and sub-decimeter GPS as-built records; contractor maintenance of native grass for one year and an 18-month seeding establishment warranty. Irrigation work may begin during the fall mobilization period.

### Description

The project is for construction services at Rose Park Golf Course in Salt Lake City. Work includes removing or abandoning existing irrigation components without disturbing playable turf, installing new irrigation mains, laterals, heads, and service feeds, constructing a settling pond, and installing a pump station with associated piping and electrical work. Bidders must be pre-qualified; the notice names Mid-America Golf & Landscape, Inc., Wagner Golf Works LLC, and Heritage Links as qualified contractors. Required submissions include a bid bond, bid form, and bid schedule.

[View original listing](https://utah.bonfirehub.com/opportunities/264093)
