# Saskatchewan Tenders #CSD-HERB-261126

Herbert School EMCS/DDC Controls and Mechanical Upgrade

**Posted:** November 26, 2026
**Respond By:** December 17, 2026
**Identifier:** CSD-HERB-261126
**NAICS:** 238220

Chinook School Division No. 211 is seeking a mechanical contractor to upgrade controls and related mechanical systems at Herbert School in Saskatchewan.
- **Buyer:** Chinook School Division No. 211.
- **Named companies:** **Greenheck** is the fan manufacturer; **Prairie Controls Ltd.** is identified for the EMCS controls work under a cash allowance; **HDA Engineering Ltd.** prepared the tender documents and serves as consultant.
- **Products:** One Greenheck CSP-A390-VG cabinet exhaust fan, tagged EF-19, for the crawlspace. It includes acoustic-lined housing, speed control, a backdraft damper, canvas duct connections, and vibration-isolation hangers. Scheduled maximum airflow is 158 CFM (335 L/s); balanced airflow is 142 CFM (300 L/s).
- **Controls and mechanical work:** Expand and modify the existing EMCS/DDC system; remove pneumatic controllers, exposed tubing, abandoned wiring, and the control compressor; replace specified thermostats, actuators, terminal-unit valves, and other listed valves; modify AHU, heating-system, and boiler controls; and add a high-level sump alarm. The EMCS work has a $75,000 cash allowance.
- **Ventilation and related work:** Replace and route sump exhaust ductwork to the exterior, install a weather-sealed wall sleeve and discharge termination, and balance designated exhaust terminations. Other work includes identified piping modifications and supports, system testing, balancing, commissioning, training, and before-and-after heating-water analyses.
- **Notable requirements:** Keep the school operational during construction, verify existing site conditions, protect and route new controls wiring to Division standards, coordinate with other trades, and leave existing equipment identified for retention in place and operating.
- **Schedule:** Equipment must be operating and work substantially complete in late summer 2027; the documents give different August completion deadlines.

### Description

The project is to replace the existing pneumatic controls, zone valves, and related equipment at Herbert School for a stipulated price. The scope includes removal of pneumatic controls and installation of new EMCS/DDC controls and associated devices, as detailed in the tender drawings and specifications. Work must be substantially completed by August 20, 2027. Tenders are invited from qualified Mechanical Contractors and must be submitted on the form furnished by the Consultant; the lowest or any tender will not necessarily be accepted.

[View original listing](https://www.sasktenders.ca/Competitions/Print?id=8d2d7220-6632-4dd8-8acb-24c5bc4c06b7)