# New York State Contract Reporter #2141254

Design and construction-phase services for Tonawanda downtown parking and waterfront improvements

**Posted:** November 27, 2026
**Respond By:** January 29, 2027
**Identifier:** 2141254
**NAICS:** 541330, 541320

The City of Tonawanda is seeking a consulting team to redesign a downtown parking area and improve connections to the waterfront.
- **Buyer:** City of Tonawanda Engineering Department / City Engineer, working with the New York State Department of State (NYSDOS).
- **Procurement:** Professional design, bidding, construction administration, and construction inspection services; no equipment or product purchases are specified.
- **Project work:** Reconstruct an approximately 3-acre city-owned parking lot near Canal Street Plaza and the Intermodal Hub; add ADA-compliant access and crosswalks, decorative energy-efficient lighting, waste-bin enclosures, landscaping, and stormwater improvements.
- **Waterfront and public-realm improvements:** Add wayfinding signage, public artwork related to Erie Canal history, removable or retractable pavilion enclosures, and a wider concrete path along Ellicott Creek; remove invasive and non-native shoreline plants.
- **Consultant responsibilities:** Coordinate meetings and site documentation; develop alternatives, designs, construction documents, specifications, and cost estimates; support bidding and contractor selection; obtain permits and approvals; and provide construction administration, inspection, closeout, and reporting. The RFP requests an inspection price for 200 hours.
- **Participation requirements:** Minority- and women-owned business utilization goals are 15% each, for a combined 30% goal.
- **Funding and term:** Funded through New York State’s Downtown Revitalization Initiative. The project is to be completed within 24 months after Notice to Proceed.
- **OEMs and vendors:** No product manufacturers or consulting firms are named as vendors in the materials.

### Description

The City of Tonawanda is seeking proposals from qualified consulting firms for design, bidding, construction administration, and construction inspection services. The project will reconstruct the city-owned parking lot adjacent to Canal Street Plaza and improve connections between downtown and the waterfront. Planned improvements include ADA-compliant crosswalks, lighting, landscaping, wayfinding signage, public artwork, pavilion enclosures, and an improved walkway along Ellicott Creek. The project is funded through the New York State Downtown Revitalization Initiative, with stated MBE and WBE goals of 15% each.

[View original listing](https://www.nyscr.ny.gov/Ads/Search)
