# Oregon Buys #S-580200-00018488

Design-build renovations and chiller replacement at Maaske Hall and APSC

**Posted:** November 25, 2026
**Respond By:** January 11, 2027
**Identifier:** S-580200-00018488
**NAICS:** 236220

Western Oregon University seeks an integrated design-build team for renovations to Maaske Hall and the Academic Programs and Support Center (APSC) in Monmouth, Oregon.
- **Buyer:** Western Oregon University, Facilities Services; the cabling scope is managed by Telecommunications Services.
- **Main work:** Convert approximately 6,214 square feet of Maaske Hall into forensic science classrooms and labs, including a blood-spatter room and courtroom-style classroom; renovate APSC for music-program offices, practice and rehearsal rooms, smart classrooms, an art gallery, and an auditorium; and replace the APSC chiller and controls.
- **Telecommunications:** Install approximately XXX Category 6a wire-drop locations, cabling, outlets, patch panels, cable management, terminations, testing, labeling, and as-built documentation. The Maaske Hall MDF requires three Chatsworth 2-post, 7-foot racks. **SYSTIMAX** MGS600-GY modular jacks are specified.
- **Named OEMs and vendors:** **Murdock**, **Kohler**, **Chicago Faucet**, **JR Smith**, **Zurn**, **Bemis**, **Mustee**, **Schier**, **SYSTIMAX**, and **Chatsworth**. Specified fixture models include Murdock BFEZS168-BF12S; Kohler K-2007-0 and K-84325-0; Chicago Faucet CHI-FCT 2201-E74ABCP and CHI-FCT 897-CRCF; JR Smith 0542FY; Zurn ZER6000AV-WS1-TM; Bemis 1955SSCT-000; Mustee 63MX; and Schier SI-1.
- **Quantities:** The forensic lab plan identifies six tables and 24 chairs. The cabling exhibit calls for approximately XXX wire-drop locations and three racks. Fixture quantities are generally unspecified; four existing floor drains are to be reconnected.
- **Notable requirements:** Provide certified cabling installers, test and certify drops, correct failed drops, protect existing cabling, and provide test records and as-builts. The chiller work includes commissioning, cooling-tower-control configuration, building automation system integration, and operating and maintenance instructions. Music-space planning includes acoustic treatment, secure instrument and music storage, rehearsal and practice areas, and room-specific percussion facilities.
- **Delivery and value:** The selected firm is expected to provide design and preconstruction, including estimating, scheduling, value engineering, safety and quality planning, and guaranteed-maximum-price development, followed by construction management/general-contractor services. The stated construction estimate is $1.5–$1.8 million, excluding design and preconstruction.
- **Attachment discrepancy:** One included contract exhibit describes a separate Computer Solutions Hub design-build project with a LEED Gold target; its connection to this Maaske Hall/APSC solicitation is unclear.

### Description

Western Oregon University is seeking proposals through a competitive one- or two-step RFP process to retain one firm for design, management, and construction services for the Maaske and APSC remodel. The project covers remodeling Maaske’s vacant first-floor space into classroom and laboratory space for forensic science education, renovating APSC for the music department, and installing a new chiller and controls at APSC. The solicitation requires attendance at a mandatory site visit on December 14, 2026. Proposals are due January 11, 2027, at 3:00 PM PST.

[View original listing](https://oregonbuys.gov/bso/external/bidDetail.sda?docId=S-580200-00018488&external=true&parentUrl=close)
