# Quebec SEAO #ING-2026-6300

Ventilation fans, motors, and VFD controls for the Centre socio-récréatif

**Posted:** November 26, 2026
**Respond By:** December 18, 2026
**Identifier:** ING-2026-6300
**NAICS:** 238220, 238210

Ville de Sept-Îles is seeking a contractor for ventilation, electrical, and controls upgrades at the Centre socio-récréatif.
- Buyer: Ville de Sept-Îles; work site is the Centre socio-récréatif.
- Requested equipment:
  - Two 6,000-CFM fans to replace the gym supply-air fan.
  - Two 5-HP, 600-V, three-phase motors for the replacement fans.
  - Two variable-frequency drives (VFDs) for the main ventilation system’s supply and return fans, replacing existing starters and controls.
- Work includes supplying, installing, connecting, testing, and commissioning the equipment. The contractor routes motor cables to the motor control center; the City makes specified MCC connections and adjusts protections for existing starters that remain.
- Work must be completed within six consecutive weeks after authorization to proceed. Maintain emergency access and ventilation operation while minimizing disruption.
- No equipment OEMs or product vendors are identified. TR3E prepared the plans and technical specifications.

### Description

The City of Sept-Îles is seeking bids for ventilation, electrical, and controls work at the Centre socio-récréatif. Work includes replacing starters and controls for the main ventilation system with variable-frequency drives, and replacing the gym supply-air fan with two smaller fans and motors. The contractor must supply, install, connect, test, and commission the equipment, with some motor-control-center connections performed by the City. Work must be completed within six consecutive weeks after authorization to begin and no later than September 30, 2027.

[View original listing](https://seao.gouv.qc.ca/avis-resultat-recherche/consulter?ItemId=e65abbc9-4b86-488b-935e-4c4c1bd38198)