# Rhode Island Proactis #TCB27006958

Route 78 On-Ramp Safety Improvements in Westerly, Rhode Island

**Posted:** November 25, 2026
**Respond By:** December 16, 2026
**Identifier:** TCB27006958
**NAICS:** 237310

Rhode Island seeks a construction contractor for safety upgrades to three Route 78 on-ramps in Westerly.
- **Buyer:** State of Rhode Island, Division of Purchases, for the Rhode Island Department of Transportation (RIDOT); work is in Westerly, Washington County.
- **Locations:** The westbound ramp at High Street/Upper High Street and the eastbound ramps at RI Route 3/Nooseneck Hill Road/Ashaway Road and RI Route 91/Westerly-Bradford Road/Oak Street.
- **Work:** Widen pavement, build acceleration lanes and extend merging space, with associated drainage, erosion control, guardrail, signs, lighting, landscaping, and traffic protection work; remove or relocate light poles as needed.
- **Major bid quantities:** 1,440 tons of Class 19.0 HMA, 1,120 tons of modified Class 9.5 HMA, and two separately listed friction-course items of 1,120 tons each; 12,890 square yards of partial-depth and 2,280 square yards of full-depth HMA preparation; 720 linear feet of new guardrail; 4,070 linear feet of compost filter sock; and 10,000 square yards each of plantable soil and seeding.
- **Lighting and electrical:** 3 133-watt LED luminaires, 8 light-standard foundations, 3 30-foot aluminum lighting standards with single 10-foot davit-arm extensions, and associated wiring, conduit, handholes, and breakaway couplings.
- **Value and term:** Estimated value is $3,363,876. The period of performance is not stated; the bid schedule includes a 36-month field-office item.
- **OEMs and vendors:** No manufacturers, OEMs, or vendors are named. This is a construction-services procurement rather than a request for branded products.
- **Notable scope details:** Includes a wet swale, a sand filter, drainage-structure work, pavement markings, sign installation/relocation, and temporary traffic protection.

### Description

The project consists of safety improvements to three on-ramps to Route 78 in Westerly, Rhode Island. Work primarily includes full-depth pavement widening, constructing acceleration lanes, and extending available merging space. It also includes removing and relocating light poles. The listed estimated value is $3,363,876, and the response deadline is December 16, 2026 at 02:00 UTC.

[View original listing](https://webprocure.proactiscloud.com/wp-web-public/en/#/bidboard/bid/145367?pagenumber=1&customerid=46)
