# Massachusetts COMMBUYS #BD-27-1022-DMH08-8210C-135631

Haskell Building Partial Roof Replacement — Elevate TPO System

**Posted:** November 25, 2026
**Respond By:** December 18, 2026
**Identifier:** BD-27-1022-DMH08-8210C-135631
**NAICS:** 238160

Massachusetts DMH seeks a contractor for a partial roof replacement at the Haskell Building in Northampton.
- **Government buyer:** Commonwealth of Massachusetts, Department of Mental Health (DMH), Office of Engineering and Facilities Management, Hadley Building / Office of Facilities Management.
- **Scope:** Project 2027-013A removes and disposes of existing EPDM roofing and replaces approximately 960 sq. ft. above the building’s third-floor corridor with a complete new thermoplastic roof assembly.
- **Named OEM / basis of design:** **Elevate** — UltraPly TPO XR 135, 80-mil nominal, mechanically fastened membrane. No other vendors are named.
- **Roof system and related products:** Include R-30ci continuous insulation sloped 1/4 inch per 12 inches, tapered insulation, 1/2-inch cover board, self-adhering vapor retarder, flashing, roof-edge metal, lap flashing, fascia, full-length gutters, conductors/downspouts, and flashing for existing roof penetrations and equipment curb extension. Replace one exterior galvanized-steel roof-access ladder with OSHA-compliant handrails.
- **Related services:** Tie in and waterproof adjacent systems; perform associated masonry work for flashing tie-ins; temporarily disconnect and reconnect mechanical and electrical services as needed to raise the equipment curb and extend services.
- **Notable requirements:** Roofing subcontractor workmanship warranty of at least 2 years and a 20-year manufacturer NDL roof-system warranty. Workers must have OSHA-approved 10-hour safety training.
- **Estimated value and duration:** Estimated construction cost is $100,000. Estimated performance is 120 calendar days from Notice to Proceed.

### Description

The Department of Mental Health is seeking roofing contractors for a partial roof replacement at the Haskell Building in Northampton, Massachusetts. The contractor must remove and dispose of the existing EPDM roof and replace it with a new roof assembly in accordance with the specifications and drawings in Part IV of the Bid Documents. A mandatory pre-bid conference and site walk-through is scheduled for December 9, 2026. The bid documents state an estimated construction cost of $100,000.

[View original listing](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-27-1022-DMH08-8210C-135631&external=true&parentUrl=close)